Special Rept:Fire Barriers in Listed Areas Declared Inoperable Greater than 7 Days.Checking Local Smoke Detectors & Establishing Hourly Fire Patrol Established as Required
ML20154N284
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/16/1988
From: Olmstead C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CAO-313-88, NUDOCS 8809290257
Download: ML20154N284 (2)


Text

%

amm uma 3

September 16, 1988 CAO-313-88 l'ortland General Electric Cornpany Trojan Nuc! car Plant 71760 Columbia Riser liwy Rainier, Oregon 97048 (503) $56-3713 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 Gentlement Soecial Report Limiting Condition for Operation (LCO) 3.7.9 of the Trojan Technical Specifications (TTS) requires submittal of a Special Report if a 3-hour fire barrier is nonfunctional for greater than seven days.

Fire barriers in the areas described below were declared inoperable on the dates indicated and remained inoperable for greater than seven days.

In each case the compensatory measures of TTS 3.7.9 (checking local e

smoke detectors and establishing an hourly fire patrol) were established as required.

1.

Fire Damper ho. 56, located on the Turbine Driven Auxiliary Feedwater Pump Room west wall (Turbine Building - 45 foot level),

was declared inoperable on August 12, 1988, when it was discovered that the damper was not installed in accordance with the manufacturer's instructions.

The damper was installed under a design modification completed in early 1979.

Conformance with the manufacturer's instructions is necessary to maintain the J

Underwriter's Laboratory (UL) Listing which is necessary to assure operability of the damper.

Repair of this damper is expected to be completed by December 30, 1988.

2.

Door No. 314, the Train Bay West roll-up door located on the Turbine Building 45 foot level, was declared inoperable on August 29, 1988.

The door's automatic closing device failed, and the door is in need of replacement as a result of being dropped.

It is expected that the door will be replaced and returned to functional status by October 15, 1988.

j 3.

Door No. 156 for the South Centrifugal Charging Pump Room, located on the Auxiliary Building 25 foot level, was declared inoperable on August 22, 1988, because of a sticking latch mechanism and possible bent hinges.

Repair of this door is expected to be completed by September 30, 1988.

8809290257 880916 M

PDR ADOCK 05000344 S

PDC l(

a

.s O

CAO-313-88 I

Page Two l

l 4.

Door No. 359 to the Auxiliary Building 77 foot level Valve Gallery was declared inoperable on August 11, 1988 because of a sticking l

latch mechanism.

Repair is expected to be completed by September 30, 1988.

I 5.

Penetration Seal No. 3104, located on the 61 foot elevation of the Turbine Building east wall, was declared inoperable on August _19, 1988.

A conduit which was neither grouted nor foamed was found to be routed through the penetration, with both ends cut off.

A design change which affected this penetration had recently been worked; however, repair of this seal was overlooked.

The penetration seal was repaired and returned to service on September 1, 1988.

Internal event reports are being initiated to determine root cause and additional corrective actions for the situations described in item 1.

Fire Damper No. 56, and 5.

Penetration Seal No. 3104.

Sincerely,

,6W X/ %

cw "

C.

A. Olmstead General Manager Trojan Nuclear Plant

/N CAO/RPS/DWS/JWL/LAH: sg c:

Mr. Bill Dixon State of Oregon Department of Energy Mr. John B. Martin Regional Administrator US Nuclear Regulatory Commission Mr. R. C.

Barr l

USNRC Resident Inspector Trojan Nuclear Plant Dietribution l

l b

l CAO-313-88 i

Pago Two

4. Door No. 359 to the Auxiliary Building 77 foot level Valve Gallery was declared inoperable on August 11, 1988 because of a sticking latch mechanism.

Repair is expected to be completed by September 30, 1988.

I

b. Penetration Seal No. 3104, located on the 61 foot elevation of the Turbine Building east wall, was declared inoperable on August 19, 1988.

A condule,which was neither grouted nor foamed was found to f

be routed through the penetration, with both ends cut off.

A design change whieh affected this penetration had recently been worked; however, repair of this seal was overlooked.

The L

1 penetration seal was repaired and returned to service on September 1, 1988.

Internal evqnt reports are being initiated to determine root cause and additional corrective actions for the situations described in item 1.

Fire Damper No. 56, and 5.

Penetration Seal No. 3104.

Sincerely,

[

,6W b g/ f+

x "

?

C.

A. Olmstead General Manager l

Trojan Nuclear Plant l

/44 l

CAO/RPS/DWS/JWL/LAH sg s

c:

Mr. Bill Dixon State of Oregon Department of Energy Mr. John B. Martin i

Regional Administrator US Nuclear Regulatory Commission Mr. R.

C.

Barr USNRC Resident Inspector l