f i
M M
~,
.I V
Ponland General Electric Company August 30,.1993 f
Trojan Nuclear Plant SMQ-060-93 SR No. 01-93 71760 Columbia River Hwy.
e Trojan Nuclear Plant
'{
Rainier. Oregon 97048 Docket 50-344 (503)356-3713 License NPF-3 U.S. Nuclear Regulatory Commission l
Document Control Desk Washington DC 20555 l
?
i Gentlemen:
Special Report 01-93 j
i Trojan Technical Specification (TTS) 3/4.7.9, " Penetration Fire Barriers",
requires, in part, the submittal of a Special Report if.a nonfunctional three-
.j hour fire barrier penetration protecting safety-related areas is not restored to functional status within seven days. TTS 3/4.7.8.2 requires; in part, the submittal of a Special Report if certain nonfunctional spray, sprinkler,;
l and/or deluge systems are not restored to functional status within 14-days.
On August 4, 1993, the Deluge System 19 deluge valve was. discovered inoperable
~f during surveillance testing. This system is required to be operable by TTS l
3/4.7.8.2 as it protects the electrical penetration area, and is needed for j
the electrical penetrations to function as three-hour-fire barriers as j
required by TTS 3/4.7.9.
The deluge valve failed the surveillance test due to normal wear of its internals. The TTS required fire watches were established and maintained until the deluge system was restored.-
-l Per the manufacturer's recommendation, the valve internals were replaced with the redesigned parts; however, this work was not completed until August 25, 1993.
sincerely,
'i b
l S. M. Quennoz-General. Manager l
Trojan Nuclear Plant
.l 1
)
c:
Mr. Bobby H. Faulkenberry Regional Administrator, Region V
[
U.S. Nuclear Regulatory Commission i
Mr. David Stewart-Smith State of Oregon Department of Energy Mr.
J.'F. Melfi USNRC Resident Inspector Trojan Nuclear Plant I O 9309000298 930830 if PDR ADOCK 05000344 tj S
PDR v.
4
~
- r..
~..,
.