MONTHYEARML20210F8701999-07-22022 July 1999 Rev 1 to PGE-1076, Trojan Reactor Vessel Package Sar ML20209C6531999-07-0606 July 1999 Rev 8 to Defueled SAR, for Trojan Nuclear Plant ML20207J0781999-02-28028 February 1999 Update to Trojan ISFSI Sar ML20202G4511999-02-0202 February 1999 Rev 0 to PGE-1076, Trojan Reactor Vessel Package Sar ML20195J2501998-11-17017 November 1998 Rev 7 to Trojan Nuclear Plant Defueled Sar ML20155E0411998-10-27027 October 1998 Amend 7 to Quality-Related List Classification Criteria for Tnp ML20237B6121998-08-13013 August 1998 Revised Trojan Reactor Vessel Package Sar ML20236Y2691998-08-0808 August 1998 Revised Trojan Rv Package Sar ML20249B4081998-06-17017 June 1998 Rev 6 to Trojan Nuclear Plant Defueled Sar ML20203B0341997-11-26026 November 1997 Rev 5 to Trojan Nuclear Plant Defueled Sar ML20148E8631997-05-31031 May 1997 Amend 6 to PGE-1052, Quality-Related List Classification Criteria for Trojan Nuclear Plant ML20137K5811997-03-31031 March 1997 SAR for Rv Package ML20140D9451997-03-31031 March 1997 Tnp First Quarter 1997 Decommissioning Status Rept ML20135B5241996-11-27027 November 1996 Rev 4 to Trojan Nuclear Plant Defueled Sar ML20135B5341996-11-25025 November 1996 Trojan ISFSI Safety Analysis Rept ML20134F4661996-10-30030 October 1996 Final Survey Rept for ISFSI Site for Trojan Nuclear Plant ML20134P4321996-09-30030 September 1996 Tnp Quarter Decommisioning Status Rept,Third Quarter 1996 ML20137K5321996-09-0505 September 1996 Rev 0 to H Analysis of Residue Protocol ML20137H2841996-06-28028 June 1996 Evaluation of Residual Radionuclide Source Term at Trojan NPP at Start of Decommissioning ML20137K5091996-06-28028 June 1996 Summary Rept Poge Tnp SFP Project ML20149H1771994-11-10010 November 1994 Rev 1 to Trojan Nuclear Plant Defueled Sar ML20059A7041993-10-21021 October 1993 Errata to Rev 0 to Defueled Sar ML20059A7441993-10-0707 October 1993 Defueled SAR for Trojan Nuclear Plant ML17352A8691993-05-31031 May 1993 Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants. ML20127N8561993-01-18018 January 1993 Safety Review of Trojan Plant Restart:Steam Generator Deterioration & Interim Plugging Criteria ML20127M1241992-11-30030 November 1992 Rev 0 to IPE Rept for Trojan Nuclear Power Plant in Response to GL 88-20 ML20245E1081988-05-31031 May 1988 Pipe Whip Restraint Gaps Pressurized Surge Line Movement ML20197E3781988-05-29029 May 1988 Pipe Whip Restraint Gaps Pressurizer Surge Line Movement ML20148M9871988-03-15015 March 1988 Safety Evaluation of Emergency Ventilation Sys Design Mods ML20153G2211988-01-31031 January 1988 Toxic Chemical Study ML20236W7681987-10-31031 October 1987 Plant Safety Evaluation for Trojan Nuclear Plant Fuel Upgrade ML20236J5011987-08-31031 August 1987 Amend 4 to Trojan Nuclear Plant Analyses of Pipe Breaks, Outside Containment ML20237H2081987-08-10010 August 1987 Rev 0 to 01-0300-1629, Independent QA Audit & Technical Quality Review of Trojan Nuclear Power Plant Pipe Support Verification Program ML20236B0971987-07-31031 July 1987 Rev 0 to Evaluation of Ultrasonic Exam Indications on RCS Loop B Hot Leg Elbow for Trojan Nuclear Plant ML20236F1681987-07-31031 July 1987 Rev 1 to Summary Rept, Independent Review of Action Plan Items to Resolve Trojan Main Feedwater Piping Restraint Failure Issue ML20236F1531987-07-17017 July 1987 Final Rept Trojan Nuclear Plant SR8 Failure Root Cause Evaluation Steam Condensation-Induced Water Hammer ML20236B1371987-07-0101 July 1987 Rev 5 to Ultrasonic Insp of Statically Cast Stainless Steel Elbow at Trojan Nuclear Power Plant ML20215G6501987-06-30030 June 1987 Evaluation of Displacement at Main Feedwater Restraint SR4 in Trojan Nuclear Plant ML20215B8041987-06-30030 June 1987 Evaluation Rept of Trojan Nuclear Plant Main Steam Pipe Wall Thickness ML20215G6531987-06-11011 June 1987 Trojan Nuclear Plant Evaluation of Main Feed Line Seismic Restraint Failure ML20214A2941986-11-0404 November 1986 Portland General Electric Nuclear Plant Engineering Design Criteria:Extension of Automatic Sprinkler Sys Be (Rdc 84-048) Turbine Bldg Trojan Nuclear Power Plant ML20215N1671986-10-31031 October 1986 Rev 1 to, Leak-Before-Break Evaluation of Reactor Coolant Loop ML20207J6621986-07-31031 July 1986 Rept on Safety-Related Motor-Operated Valve Switch Setting Review & Testing Program for Trojan Nuclear Plant ML20198R9851986-06-30030 June 1986 Rev 0 to Evaluation of Reactor Coolant Loop for Restrained Thermal Expansion,Trojan Nuclear Plant, Summary Rept ML20203D5621986-06-17017 June 1986 Vol 2 of Amend 3 to PGE-1041, Dcrdr Summary Rept for Trojan Nuclear Plant ML20198S0511986-05-23023 May 1986 Interim Rept of Independent Review of Trojan Nuclear Plant Reactor Coolant Loop Thermal Movements Evaluation Program. Supporting Info Encl ML20197E7581986-01-31031 January 1986 Rev 0 to Preliminary Thermal Expansion Evaluation of Reactor Coolant Loop for Trojan Nuclear Plant ML20137H5981985-11-30030 November 1985 Review of Auxiliary Feedwater Sys for Reliability Improvements ML20138H8951985-06-30030 June 1985 Rev 0 to Leak-Before-Break Evaluation of Reactor Coolant Loop, Final Rept ML20136F2941984-06-30030 June 1984 Trojan Nuclear Power Plant Mod & Stress Analysis Rept for Pressurizer Safety & Relief Valve Small-Bore Piping Sys 1999-07-06
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20210F8701999-07-22022 July 1999 Rev 1 to PGE-1076, Trojan Reactor Vessel Package Sar ML20209C6531999-07-0606 July 1999 Rev 8 to Defueled SAR, for Trojan Nuclear Plant ML20206H4501999-05-0505 May 1999 Safety Evaluation Supporting Amend 201 to License NPF-1 ML20206C9351999-04-23023 April 1999 Safety Evaluation Supporting Amend 199 to License NPF-1 ML20206C9751999-04-23023 April 1999 Safety Evaluation Supporting Amend 200 to License NPF-1 ML20207G9881999-03-0303 March 1999 Rev 6 to Trojan Nuclear Plant Decommissioning Plan ML20207J0781999-02-28028 February 1999 Update to Trojan ISFSI Sar ML20202G4511999-02-0202 February 1999 Rev 0 to PGE-1076, Trojan Reactor Vessel Package Sar ML20207C6981998-12-31031 December 1998 1998 Annual Rept for Trojan Nuclear Plant. with ML20195J2501998-11-17017 November 1998 Rev 7 to Trojan Nuclear Plant Defueled Sar ML20155E0561998-10-29029 October 1998 SER Approving Two Specific Exemptions Under 10CFR71.8 for Approval of Trojan Reactor Vessel Package for one-time Shipment to Us Ecology Disposal Facility Near Richland,Wa ML20155E0411998-10-27027 October 1998 Amend 7 to Quality-Related List Classification Criteria for Tnp ML20154R4121998-10-0202 October 1998 Requests Commission Approval,By Negative Consent,For Staff to Grant Two Specific Exemptions from Package Test Requirement Specified in 10CFR71 for Trojan Reactor Vessel Package & to Authorize one-time Transport for Disposal ML20237B6121998-08-13013 August 1998 Revised Trojan Reactor Vessel Package Sar ML20151W5471998-08-13013 August 1998 Rev 22 to PGE-8010, Poge Nuclear QA Program for Trojan Nuclear Plant ML20236Y2691998-08-0808 August 1998 Revised Trojan Rv Package Sar ML20249B4081998-06-17017 June 1998 Rev 6 to Trojan Nuclear Plant Defueled Sar ML20203E6291998-02-28028 February 1998 Trojan Nuclear Plant Decommissioning Plan ML20198T1741998-01-0404 January 1998 Rev 5 to Trojan Nuclear Plant Decommissioning Plan ML20248K6891997-12-31031 December 1997 Enron 1997 Annual Rept ML20203J3821997-12-31031 December 1997 Annual Rept of Trojan Nuclear Plant for 1997 ML20248K6931997-12-31031 December 1997 Pacificorp 1997 Annual Rept. Financial Statements & Suppl Data for Years Ended Dec 1996 & 97 Also Encl ML20203B0341997-11-26026 November 1997 Rev 5 to Trojan Nuclear Plant Defueled Sar ML20199F8141997-10-21021 October 1997 Requests Approval of Staff Approach for Resolving Issues Re Waste Classification of Plant Rv ML20216F4291997-07-25025 July 1997 Requests Commission Approval of Staff Approach for Reviewing Request from Poge for one-time Shipment of Decommissioned Rv,Including Irradiated Internals to Disposal Site at Hanford Nuclear Reservation in Richland,Wa ML20141F2311997-06-24024 June 1997 Rev 3 to PGE-1061, Tnp Decommissioning Plan ML20148K3541997-06-0909 June 1997 Safety Evaluation Supporting Amend 198 to License NPF-1 ML20148E8631997-05-31031 May 1997 Amend 6 to PGE-1052, Quality-Related List Classification Criteria for Trojan Nuclear Plant ML20148D2681997-05-23023 May 1997 Safety Evaluation Supporting Amend 197 to License NPF-1 ML20141H3181997-05-19019 May 1997 Safety Evaluation Supporting Amend 196 to License NPF-1 ML20140D9451997-03-31031 March 1997 Tnp First Quarter 1997 Decommissioning Status Rept ML20137K5811997-03-31031 March 1997 SAR for Rv Package ML20136D5591997-03-0606 March 1997 Safety Evaluation Approving Merger Between Util & Enron Corp ML20134B6231997-01-15015 January 1997 Draft Rev 3 of Proposed Change to Trojan Decommissioning Plan ML20217M2381996-12-31031 December 1996 Portland General Corp 1996 Annual Rept ML20217M2471996-12-31031 December 1996 Pacific Power & Light Co (Pacifcorp) 1996 Annual Rept ML20217M2551996-12-31031 December 1996 1996 Enron Annual Rept ML20135C3521996-12-31031 December 1996 Annual Rept of Trojan Nuclear Plant for 1996 ML20132G2831996-12-19019 December 1996 Rev 2 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan ML20132H0011996-12-12012 December 1996 Rev 20 to PGE-8010, Portland General Electric Nuclear QA Program for Trojan Nuclear Plant ML20132B8491996-12-12012 December 1996 Rev 20 to PGE-8010, Trojan Nuclear Plant Nuclear QA Program ML20135B5241996-11-27027 November 1996 Rev 4 to Trojan Nuclear Plant Defueled Sar ML20135B5341996-11-25025 November 1996 Trojan ISFSI Safety Analysis Rept ML20134M3381996-11-20020 November 1996 SER Approving Physical Security Plan for Proposed Trojan ISFSI ML20134K6621996-11-11011 November 1996 Decommissioning Plan,Tnp ML20134F1211996-10-31031 October 1996 Safety Evaluation Supporting Amend 195 to License NPF-1 ML20134F4661996-10-30030 October 1996 Final Survey Rept for ISFSI Site for Trojan Nuclear Plant ML20134P4321996-09-30030 September 1996 Tnp Quarter Decommisioning Status Rept,Third Quarter 1996 ML20137K5321996-09-0505 September 1996 Rev 0 to H Analysis of Residue Protocol ML20137K5091996-06-28028 June 1996 Summary Rept Poge Tnp SFP Project 1999-07-06
[Table view] |
Text
.
PGE-1052 QUALITY-RELATED LIST CLASSIFICATION CRITERIA FOR THE TROJAN NUCLEAR PLANT 6
i I
l t-1 i
i f
i~
l
(
Amendment 7 j .-
i i
).
l i
i l
PORTLAND GENERAL ELECTRIC COMPAh"I j 121 SW SALMON STREET l PORTLAND, OREGON 97204 6
f 9811040145 9910275 PDR ADOCK 05000344 Y PDR J
s ,_. J _ , w_ =, . &
QUALITY-RELATED LIST CLASSIFICAITON CRITERIA FOR THE TROJAN NUCLEAR PLANT
-(^N, '
'\j '
FIGURES
_ Number Title Section 2.1 2.1 System Classification Form 2.2 Component Classification Form 2.3 Electrical Component "1E" Evaluation Procedure O
O Amendment 7 iV October 1998
, , . - - - . . ~ . . - - . . - - . - ~ . ~ . _ . - ... ~ _., - . , . . . . ~ . - . - . , . -
l.
,. s." \
l LIST OF EFFECTIVE PAGES )
PGB-1052 I QUALITY-RELATED LIST CLASSIFICATION CRITERIA '
FOR THE TROJAN NUCLEAR PLANT l: l j, Amendment 7 Amendment Pace Numher' Numher Date Title Page' 7 Oct. 1998 4 i 5 Sept. 1995
~ 11' ~3 Nov. 1993 t- lii 5 Sept. 1995 l
iv 7 Oct. 1998 v 7 Oct. 1998 ,
1-1 5 Sept. 1995 1-2 through 1 3 Nov. 1993 7 and 1-8 5 Sept. 1995 1-9 3 Nov. 1993 2-1 through 2-7 3 'Nov. 1993 2-8 5 Sept. 1995' 2-9 3 Nov. 1993-Table 2.1,. Sheets 1 through 3 3 Nov. 1993 Table 2.2, Sheets 1 through 2 Original Nov. 1987
. Table 2.3, Sheets 1 through 2 Original .Nov. 1987 Table 2.4, Sheet 1 Original Nov. 1987 Table 2.5, Sheets 1 through 2 Original Nov. 1987 ;
l-Table 2.6, Sheets 1 through 3 Original Nov. 1987 l Table 2.7, Sheet 1 . Original Nov. 1987 l Figure 2.1, Sheets 1-through 2 Original Nov. 1987 Figure 2.2, Sheet 1 Original Nov. 1987 i Figure 2.3, Sheet 1 Original Nov. 1987
'3-1 3 Nov. 1993 l
-Table 3.1, sheets 1 through 19- 3 Nov. 1993 ,
4-1 through 4-3 3 Nov. 1993 l 4 5 Sept. 1995 l 4-5lthrough 4-8 3 Nov. 1993 -l'
'4-9 5 Sept. 1995 4-10 through 4-15 3 Nov. 1993 4-16 5 Sept. 1995 4-17 6 May 1997 4-18 through 4 3 Nov. 1993 l
4-20'and 4-21 5 Sept. 1995 4-22 through 4-24 3 Nov. 1993 4-25 and 4-26 7 Oct. 1998 l 4-27 through 4-35.(deleted) .
7 Oct. 1998 Figures 4.8.2-1.through 4.8.2-20 . (deleted) 7 Oct. 1998
. 5 - 1~' 3 Nov. 1993 A-1 through A-4 5 Sept. 1995 B-1 5 Sept. 1995
- / -
U l 4
v Amendment 7 October 1998
1 1
1
- 4. s notmDARIER OF RADWASTE MANAnRMENT SYSTEMS sJ - -
l This section provides the criteria for determining which components are within the boundaries of the Radwaste Management Systems. Due to Trojan's permanently defueled status numerous systems no longer required are being )
j deactivated.. When a system or portions thereof has completed Phase V of the deactivation process in accordance with Trojan Plant Procedure requirements or l has been physically isolated or deactivated by a design modification, the 4
deactivated system and components will no longer be classified as Quality Related..
I
- This section identifies those portions of the Radwaste System that fall within the requirements of Regulatory Guide (RG) 1.143. This subset of the Radwaste System that must meet the requirements of RG'1.143 is considered augmented-l 4_ qua lity-related. Those portions of the Radwaste System that fall outside of the requirements'of RG 1.143 cannot be automatically assumed to be non-
[.
quality-related; other considerations must be evaluated before that-I' determination may be made (i.e., seismic II/I, Technical Specification
. Monitoring, etc.). i In identifying the RG boundaries, the following general guidelines are used:
The radwaste. systems are considered to begin at the interface valve (s) in each line from other systems provided for collecting wastes that may
- contain radioactive materials and to include related instrumentation and control systems.
The radioactive waste system terminates at the point of controlled discharge to the environment or at the point of storage of packaged solid wastes prior to shipment offsite to a licensed burial ground.
For, design purposes, portions of radwaste systems that interface with other systems are considered to be in the system with the more rigorous requirements.
i
- The Guide does not apply to the reactor water cleanup system, the I condensate cleanup system, the reactor coolant and Auxiliary Building equipment drain tanks, the sumps and floor drains provided for
[(
f Amendment 7
- 4-25 October 1998