ML20236T220

From kanterella
Jump to navigation Jump to search
Special Rept:On 871112,south Fire Main Loop Removed from Svc to Repair Leak in Sys.Backup Fire Suppression Water Sys Established in Accordance W/Limiting Condition for Operation 3.7.8.1.Sys Returned to Operable Status on 871112
ML20236T220
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/24/1987
From: Olmstead C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CAO-429-87, NUDOCS 8712010080
Download: ML20236T220 (1)


Text

__. _ - _ _ - _ - _ - _ - _ _ _ _ _ _ _ _.

h g ~

M l

M E-h Portland General Electric Company Trojan Nuclear Plant November 24, 1987

. 71760 Columbia River Hwy CAO-429-87 Rainier. Oregon 97048

.(503) 556-3713

.U.S.

Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 Gentlemen Special Report Limiting Condition for Operation.(LCO) 3.7.8.1 of the Trojan Technical Specifications requires the submittal of a follow-up Special' Report within 14 days if the fire suppression water system becomes inoperable.

On November 12, 1987 at 0555 hours0.00642 days <br />0.154 hours <br />9.176587e-4 weeks <br />2.111775e-4 months <br />, the south fire main loop was removed from service to repair a leak in the system.

In accordance with LCO 3.7.8.1, a backup fire suppression water system was established.

The system was returned to operable status at 1640 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.2402e-4 months <br /> on November 12, 1987.

Sincerely, C.aOw C.

A.

Olmstead CAO/ PS/

/

K:sg c:

Mr. David Kish, Director State of Oregon i

Department of Energy Mr. John B.

Martin Regional Administrator US Nuclear Regulatory Commission Mr.

R.

C. Barr

+

USNRC Resident Inspector Trojan Nuclear Plant Distribution 0

l IPA les N J'

-pr#

//o S

,