ML20135C177

From kanterella
Revision as of 08:22, 20 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notifies of Util Application for Permit Re Use of Cooling Water from Beechwood Pit Filed W/Delaware River Basin Commission.Questions Raised Re Effects of Water on Quality of Schuylkill River & Need for Addl EIS-related Work
ML20135C177
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/06/1985
From: Wisniewski W
ENVIRONMENTAL PROTECTION AGENCY
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8509110346
Download: ML20135C177 (1)


Text

'

/" *%, UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

/ O 33 REGION ill 841 Chestaut Building w Philadelphia, Pennsylvania 19107 SEP G 1935 SEP o 03 Mr. Harold Denton

, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

We have recently learned of an application for a permit by the Phila-delphia Electric Company to the Delaware River Basin Commission regarding a source of cooling water that heretofore has not been mentioned. The cooling water would be used by the Limerick Nuclear Pc.wer Facility and would come from a flooded abandoned mine near Pottsville, Pennsylvania, known as the Beechwood Pit, owned by the Reading Anthracite Company.

My staff has been unable to find any analytical information regarding the Beechwood Pit in past Environmental Impact Statements. While we realize the application is for a temporary permit, covering the low flow period of j the end of the year, I believe the situation raises two questions:

  • Have any impact analyses of the affects of this water on the quality of the Schuykill River ever been carried out?
  • Do the cooperating agencies believe additional EIS-related work is warranted?

In your consideration of this issue, please refer to the CEQ Regu-lation covering criteria for development of supplemental NEPA documents.

These criteria can be found in 40 CFR 1502.9 (c).

Thank you for your attention in this matter and if any coordination is desired, please feel free to contact either Messrs. Richard Pepino or Robert Davis of my staf f. Their phone numbers are, respectively, 597-9301 and 597-8327.

Sincerely, 8509110346 850906 ~

AN O M/ -

f William T. Wisniewski Assistant Regional Administrator for Policy and Management cc: George C. Kanuck,Jr.

U.S. Commissioner, Delaware River Basin Commission Gerald Hansler, DRPC .,

ID l