ML20135H793

From kanterella
Revision as of 16:46, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Operating Procedures,Per Miner Request,To Aid in NRC Review of 850412 Request for Permanent Exemption from Requirements of 10CFR50.44(c) Re Installation of Reactor Vessel Head Vent
ML20135H793
Person / Time
Site: Rancho Seco
Issue date: 09/19/1985
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Thompson H
Office of Nuclear Reactor Regulation
Shared Package
ML20135H794 List:
References
RJR-85-449, TAC-57558, NUDOCS 8509240236
Download: ML20135H793 (1)


Text

_

l esw.

SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Street, P.O. Box 15830. Sacramento CA 95852-1830.(916) 452-3211 1 RJR 85-449 AN ELECTRIC SYSTEM SERVING THE HEART OF CAllFORNIA September 19, 1985 s

DIRECTOR OF NUCLEAR REACTOR REGULATION ATTN HUGH L THOMPSON JR DIVISION OF LICENSING U S NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555 DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT NO. 1 EXEMPTION REQUEST - 10 CFR 50.44(c)(3)111, VESSEL HEAD VENTS Please find attached the District's operating procedures verbally requested by Mr. Sydney Miner. It is our hope that these procedures will aid in your review of the District's request for permanent exemption from the installation of a reactor vessel head vent, dated April 12, 1985.

If you have any questions, please contact Mr. Robert Little of my staff at (916) 732-6021.

R. J. RODRIGUE ASSISTANT GENER L MANAGER, NUCLEAR Attachment 8509240236 850919 PDR ADOCK 05000312 P PDR

\

l h6 t

(10