1 05-29-85 Rev. l' WP0013F 0-0063P CP.105 l
TRANSIENT TERMINATION FOLLOWING AN OCCURRENCE THAT MAY i
REQUIRE PRESSURIZER RECOVERY $0LIO PLANT COOLDOWN
,; }
WITH OTSG REMOVING HEAT AND RCS SUBCOOLED
_ _ _. 1 e
?
1.0 E THE HIGH POINT VENT VALVES HAVE BEEN OPENE0,' LEAVE OPEN UNTIL CORE '.. ;6 l :
1 COOLING IN DECAY HEAT MODE IS ESTABLISHED OR WHEN ON NATURAL CIRCULATION W 1
' THE RCS TEMPERATURE IS <212*F, THEN CLOSE HIGH POINT VENTS.
T.
- 6i j 2.0 IF THERE IS A BUBBLE IN THE PRESSURIZER, GO TO CP.102, OTHERWISE
.t CONTINUE.
~
l t
i,j 3.0 START RCPs.
<(
.1 E any RCPs are running, THEN go to Step 4.0, otherwise continue.
a,w n. j [ i
,,,! I
.2 E natural circulation is in progress, THEN start RCPs per OP A.2,'RCP > -, : t.- >
System. One operating RCP per loop is desired.
,y u n.
[
CONTROL HPI FLOW.
4.
4.0 a
i
.1 Adjust HPI flow to remain as close as possible to the adequate subcooling margin in the RCS.
t
.2 Close or verify closed. EMOV and EMOV block valve (HV-21505).
.3 Close or verify closed, pressurizer vent valves HV-21515 and HV-21517.
yr,
1 ++
.4 Close or verify closed, pressurizer vent valves HV-21528 and HV-21522 on panel H2SP.
.5 Establish letdown flow.
.6 Control HPI and letdown flow to remain as close as possible.to the adequate subcooling margin.
A 5.0 IF THE DECISICN IS MADE NOT TO TRY TO ESTABLISH A BUBBLE IN THE PRESSURIZER, THEN PROCEED WITH A SOLIO. PLANT COOLDOWN, STEP 8.0.
i W211!an P4h2 e
I 1
6.0 ESTABLISH A BU88LE IN THE PRESSURIZER.
.1 Tu'rn ob all available pressurizer heaters.
.2 Maintain RCS pressure with HPI.
.3 Continue cooling down the RCS, 00 NOT exceed 100*F/hr. 00 NOT violate
}[
curves on Figure 1.
t,
.4 Mon'itor pressurize'r temperature and incore temperature. WHEN b
4 pressurizer water temperature is > 50* above incore temperature,; lower. "'
pressurizer level to form a steam bubble.-
,M
.5 WHEN a bubble is: established in the pressurizer, lower the pressurizer
. level to approximately 200 inches.
2.
7.0 GO TO CP.102.
i 8.0 CONTROL HPI.
ir ~
.1 Maintain the RCS about 30*F colder than the adequate subcooling margin
- :L'. t -
(:
I by throttling HPI.
.2 1[ the RCS temperature cannot be maintained about 30*F colder than the ;;; t:
adequate subcooljng margin, THEN maintain maximum HPI flow.
- .y n
.3 Close letdown. isolation valve (STV-22009), if needed, to maintain RCS
. c :.
7 temperature 30* colder than adequate subcooling margin.
.4 Rule 2.
1 9.0 BEGIN C00LDOWN.
.1 Using small incremental steps, open the turbine bypass valves to attain -
a cooldown rate such that adequate subcooling margin is not violated.
a-
.2 Further adjustment of HPI flow and turbine bypass valve position should be accomplished so as to maintain the cooldown rate less than 100*F/hr while maintaining adequate subcooling margin.
.3 IF a small break LOCA has occurred, THEN continue with CP.103, Step 11.0 as necessary.
.4 Continue cooldown while attending to overall plant cooldown per OP B.4, Section 5.0.
i END Rev. 1 CP.105-2 i