1 05-29-85 Rev. l' WP0013F 0-0063P CP.105 l

TRANSIENT TERMINATION FOLLOWING AN OCCURRENCE THAT MAY i

REQUIRE PRESSURIZER RECOVERY $0LIO PLANT COOLDOWN

,; }

WITH OTSG REMOVING HEAT AND RCS SUBCOOLED

_ _ _. 1 e

?

1.0 E THE HIGH POINT VENT VALVES HAVE BEEN OPENE0,' LEAVE OPEN UNTIL CORE '.. ;6 l :

1 COOLING IN DECAY HEAT MODE IS ESTABLISHED OR WHEN ON NATURAL CIRCULATION W 1

' THE RCS TEMPERATURE IS <212*F, THEN CLOSE HIGH POINT VENTS.

T.

6i j 2.0 IF THERE IS A BUBBLE IN THE PRESSURIZER, GO TO CP.102, OTHERWISE

.t CONTINUE.

~

l t

i,j 3.0 START RCPs.

<(

.1 E any RCPs are running, THEN go to Step 4.0, otherwise continue.

a,w n. j [ i

,,,! I

.2 E natural circulation is in progress, THEN start RCPs per OP A.2,'RCP > -, : t.- >

System. One operating RCP per loop is desired.

,y u n.

[

CONTROL HPI FLOW.

4.

4.0 a

i

.1 Adjust HPI flow to remain as close as possible to the adequate subcooling margin in the RCS.

t

.2 Close or verify closed. EMOV and EMOV block valve (HV-21505).

.3 Close or verify closed, pressurizer vent valves HV-21515 and HV-21517.

yr,

1 ++

.4 Close or verify closed, pressurizer vent valves HV-21528 and HV-21522 on panel H2SP.

.5 Establish letdown flow.

.6 Control HPI and letdown flow to remain as close as possible.to the adequate subcooling margin.

A 5.0 IF THE DECISICN IS MADE NOT TO TRY TO ESTABLISH A BUBBLE IN THE PRESSURIZER, THEN PROCEED WITH A SOLIO. PLANT COOLDOWN, STEP 8.0.

i W211!an P4h2 e

I 1

6.0 ESTABLISH A BU88LE IN THE PRESSURIZER.

.1 Tu'rn ob all available pressurizer heaters.

.2 Maintain RCS pressure with HPI.

.3 Continue cooling down the RCS, 00 NOT exceed 100*F/hr. 00 NOT violate

}[

curves on Figure 1.

t,

.4 Mon'itor pressurize'r temperature and incore temperature. WHEN b

4 pressurizer water temperature is > 50* above incore temperature,; lower. "'

pressurizer level to form a steam bubble.-

,M

.5 WHEN a bubble is: established in the pressurizer, lower the pressurizer

. level to approximately 200 inches.

2.

7.0 GO TO CP.102.

i 8.0 CONTROL HPI.

ir ~

.1 Maintain the RCS about 30*F colder than the adequate subcooling margin

:L'. t -

(:

I by throttling HPI.

.2 1[ the RCS temperature cannot be maintained about 30*F colder than the ;;; t:

adequate subcooljng margin, THEN maintain maximum HPI flow.

.y n

.3 Close letdown. isolation valve (STV-22009), if needed, to maintain RCS

. c :.

7 temperature 30* colder than adequate subcooling margin.

.4 Rule 2.

1 9.0 BEGIN C00LDOWN.

.1 Using small incremental steps, open the turbine bypass valves to attain -

a cooldown rate such that adequate subcooling margin is not violated.

a-

.2 Further adjustment of HPI flow and turbine bypass valve position should be accomplished so as to maintain the cooldown rate less than 100*F/hr while maintaining adequate subcooling margin.

.3 IF a small break LOCA has occurred, THEN continue with CP.103, Step 11.0 as necessary.

.4 Continue cooldown while attending to overall plant cooldown per OP B.4, Section 5.0.

i END Rev. 1 CP.105-2 i