Notice of Violation from Insp on 860118-0224
ML20138A334
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/07/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20138A319 List:
References
50-416-86-02, 50-416-86-2, NUDOCS 8603140198
Download: ML20138A334 (1)


Text

-

. . . g.

ENCLOSURE 1 NOTICE OF VIOLATION

l. Mississippi Power and Light Company Docket No. 50-416

! Grand Gulf License No. NPF-29 l

l The following violations were identified during an inspection conducted on

l. January 18 - February 24, 1986. The Severity Levels were assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

~

10 CFR 50.59 states in part that the licensee may make changes in the facility or procedures as described in the safety analysis report unless the proposed change involves an unreviewed safety question. The licensee shall maintain records of changes in the facility and procedures made pursuant to this section to the extent that such changes constitute changes in the facility or procedures as described in the safety analysis report. These records shall include a written safety ev'aluation.

Contrary to the above, the following changes were made to the procedures or facility as described in the original final safety analysis report (FSAR) without performing a written safety evaluation.

(1) FSAR paragraph 13.1.2.2.16.1 was revised to delete the requirement for the shift superintendent to be responsible for protective tagging.

.(2) FSAR paragraph 6.3.2.2.1 was revised to lower the required water level over the High Pressure Core Spray System suction piping entrance in the condensate storage tank from 2-1/2 feet to approximately 3/4 feet.

(3) FSAR paragraph 3.8.1.2.2.1 was revised to incorporate additional exceptions to subparagraph c, the applicable code for welding in building construction.

This is a Severity Level IV violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.