ML20107M421

From kanterella
Revision as of 14:17, 18 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Evaluation of IE Bulletin 84-03 Re Refueling Cavity Water Seal Reinitiated Due to Inadequate Response. Rept Addressing Bulletin Concerns Will Be Provided by 850315
ML20107M421
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/12/1985
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-524, IEB-84-03, IEB-84-3, NUDOCS 8503010266
Download: ML20107M421 (2)


Text

- ~ - .- . . _ _ _

Route 2. Box 299A.

Waynesboro, Georgia 30830 Telephone 404 554 9061, Ext. 3360 404 724-8114. Ext. 3360 Georgia Power

o. o. ro.i.' -

85 FEB 19 A9: 39 ne tanage IN sou!N.rn strc mtem Vogtte Project '

February 12, 1985

United States Nuclear Regulatory Commission

Reference:

-Office of Inspection and Enforcement RII: JP0:

Region II - Suite 2900 50-424, 50-425

A ~ 101 Marietta ' Street, Northwest Atlanta, Georgia 30323 File
,X7BC24 Log: ,GN-524 Attention: Mr. James P. O'Reilly In a letter of December 5,1984 (X7BC24, GN-490), Georgia Power

. Company responded . to I&E- Bulletin 84-03, " Refueling Cavity Water Seal".

We have recently been informed by our USNRC Resident Inspector staff.

that the evaluation described in that previous correspondence was perfomed on components other than those intended by the Bulletin.

The components addressed in our initial evaluation are often called refueling cavity water seals, which is the -terminology used in the Bulletin and the Vogtle refueling ~ cavity seal ring assembly in no way resembles the water sea 1 ' assembly shown in- Figure 1 of Bulletin 84-03.

4 . This ' letter is to inform you' that Georgia Power Company has re-initiated its evaluation of I&E Bulletin 84-03 and expects to provide the USNRC with a report addressing the concerns of the Bulletin for the Vogtle refueling cavity seal ring assembly by March 15, 1985.

This letter contains no proprietary information and may be placed in the NRC Public Document Room.

Your truly,

/

. 0.' os(er/

REF/DOF/tdm n

8503010266 850212 DR ADOCK 050004 4 y

.---- - . ML

pJ. . ..

Page Two' D. O. Foster states that he is the Vice President and Project General Manager of the Vogtle Electric _ Generating Plant and is authorized to execute this oath on behalf of Georgia Power Company and that to the best of his knowledge;and belief the facts set forth in this letter are true.

/

./

/

GPC: , f

_4 Sworn and subscribed before me this /M day of February,1985.

0c4S Y U No a 1 Pdblic, State of Georgia at Large

.My ommission Expires: f////FF xc: U. S. Nuclear Regulatory Commission Document Control Desk-Washington, D.C. 20555 R.'J. Kelly J. A. Bailey G. Bockhold R. E. Conway 0. Batum P. D. Rice G. F. Head H. H. Gregory C. S. McCall (0PC)

J. T.' Beckham W. T. Nickerson E. L. Blake, Jr.

R. A. Thomas D. R. Altman (Shaw, et. al.)

D. E. Dutton D. L. Kinnsch (BPC) J. E. Joiner W. F. Sanders (NRC) J. L. Vota (W) (Troutman, et. al . )

R. H. Pinson L. T. Gucwa D. C. 'Teper (GANE)

B. M. Guthrie C. E. Belflower L. Fowler (LEAF)

E. D. Groover M. Malcom (BPC) T. Johnson (ECPG)

R. W. McManus m_-