Interim Deficiency Rept,Item Q-14 Re Inadequacy of Control & Distribution of Design Specs.Initially Reported on 831013. Applicable Procedures for Review,Approval & Distribution Will Be Revised.Next Rept Will Be Provided by 840105
ML20082B817
Person / Time
Site: Zimmer
Issue date: 11/10/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0207, LOZ-83-207, Q-14, NUDOCS 8311210338
Download: ML20082B817 (2)


Text

- . .- - .. -. .. .- .. .-

  • No i

b i 1 7 THE CINCINNATI GAS & ELECTRIC COMPANY CINCINNATI.ONIO 45201 November 10, 1983 LOZ-83-0207 J. WILUAME JR SENIOR VICE PRESIDENT NUCLEAR OPERAftONS DocketLNo.'50-358 i -

i I U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road -

Glen Ellyn, Illinois ~60137 Attention: Mr. J.G. Keppler Regional Administrator 4 Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 i 10CFR50. 55 (e ) , ITEM Q-14, CONTROL OF DESIGN SPECIFICATIONS

W.O. 57300, JOB ~E-5590;~ FILE NO.'956C;'O-14 This letter constitutes an interim report ~concerning the subject condition initially reported"to the Commission on October s

13,-1983 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e) .

The condition identifies deficiencies'in the distribution and control of design specifications issued:b'y our architectual

. engineer, Sargent & Lundy and is documented on H.J. Kaiser

] Corrective Action Request (CAR) 508.

1 i

This deficiency was caused by.a cumbersome system to-

, distribute specifications. To preclude recurrence, applicable i proceduresffor review, approval and distribution of specifications will be revised-to assure 1that approved copies of specifications are distributed in a controlled and, timely. manner.-

The. safety significance of this deficiency _ is difficultito-determine; therefore, it is - being ' treated 'as if it- were reportable.- To assure that : there will be ' no resulting items of c safety significance in the completed ~ plant, the: Plan'for verification of the-Qualityfof construction includes. review of the construction ~against'the1 approved' specifications.

All resulting corrective action will be completed prior to commencement of the PVQC..A' follow-up' report'concerning-our -l progress in-this-matter will be'provided.by January'5, 1984.

8311210338 831110

~.

.g h PDR ADOCK 05000358 S _ _, PDR  ; _ pp -- -

o Mr. J.G. Keppler Regional Administrator November 10, 1983 LOZ-83-0207 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By J4 - _

w1LL1 ads,' J .

ENIOR VICE P SIDENT BLT/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site' Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz l