ML20081F087

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Item M-61 Re Fire Protection Piping Suspended from Essential Cable Tray Supports.Mods Stopped by 821112 Show Cause Order Immediately Suspending Const.Final Rept Will Be Submitted Upon Mod Completion
ML20081F087
Person / Time
Site: Zimmer
Issue date: 10/25/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0196, LOZ-83-196, M-61, NUDOCS 8311020342
Download: ML20081F087 (2)


Text

.

r

, ,,. 8 m

~

6 THE CINCINNATI GAS & ELECTRIC COMPANY CINCINN ATi. OHIO 452Of October 25, 1983 LOZ-83-0196 J. WILUAM S, JR sENtO4 wCE PRESIDENT NUCLEAR OPERATeoNS Docket No. 50-358 U.S. Nitclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M-61, FIRE PROTECTION PIPING SUSPENDED FROM ESSENTIAL CABLE TRAY SUPPORTS W.O. 57300, JOB E-5590, FILE NO. 956C, M-61 This letter constitutes an interim report concerning the subject reportable deficiency reported to the Commission under 10CFR50. 55 (e) .

Our last report LOZ-83-0093 of July 27, 1983 committed that a follow-up report would be submitted November 11, 1983. It further stated that an analysis of the safety implications of

'this condition would be completed; however, that analysis was previously completed and reported in our letter LOZ-83-0017 of April 13, 1983.

The only remaining action necessary to complete our report on this deficiency is the completion of the corrective modifications previously described in an interim report. This work was stopped by the NRC November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction."

These modifications would affect essential cable tray I supports which themselves are being reinspected under the Quality Confirmation Program. Therefore, these modifications are not considered appropriate to perform under a relaxation to the Show Cause Order.

The corrective modifications will be completed under the program described in our Course of Action submitted to the NRC October 3, 1983. Upon completion of the corrective modifications, ve will submit a final report on this deficiency.

' 4 8311020342 831025 _c$ '

& Ill PDR ADOCK 05000358 S PDR W -f ? h f7

l Mr. J.G. Keppler Regional Administrator October 25, 1983 LOZ-83-0196 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By M

. WILLIAMS, J SENIOR VICE P SIDENT DJS/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz k