1 THE CINCINNATI GAS & ELECTRIC COMPANY 7
CINCINNATI.ONIO 45201 November 10, 1983 LOZ-83-0207 J. WILUAME JR SENIOR VICE PRESIDENT NUCLEAR OPERAftONS DocketLNo.'50-358 i
i I
U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road -
Glen Ellyn, Illinois ~60137 Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
4 RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 i
10CFR50. 55 (e ), ITEM Q-14, CONTROL OF DESIGN SPECIFICATIONS W.O. 57300, JOB ~E-5590;~ FILE NO.'956C;'O-14 This letter constitutes an interim report ~concerning the subject condition initially reported"to the Commission on October 13,-1983 as a potentially reportable deficiency under the s
requirements of 10CFR50.55 (e).
The condition identifies deficiencies'in the distribution and control of design specifications issued:b'y our architectual engineer, Sargent & Lundy and is documented on H.J. Kaiser
]
Corrective Action Request (CAR) 508.
1 i
This deficiency was caused by.a cumbersome system to-distribute specifications.
To preclude recurrence, applicable proceduresffor review, approval and distribution of i
specifications will be revised-to assure 1that approved copies of specifications are distributed in a controlled and, timely. manner.-
The. safety significance of this deficiency _ is difficultito-determine; therefore, it is - being ' treated 'as if it-were reportable.- To assure that : there will be ' no resulting items of c
safety significance in the completed ~ plant, the: Plan'for verification of the-Qualityfof construction includes. review of the construction ~against'the1 approved' specifications.
All resulting corrective action will be completed prior to commencement of the PVQC..A' follow-up' report'concerning-our
-l progress in-this-matter will be'provided.by January'5, 1984.
h
~.
8311210338 831110
.g PDR ADOCK 05000358 p
_ _, PDR p
S
o Mr. J.G. Keppler Regional Administrator November 10, 1983 LOZ-83-0207 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By J4 - _
w1LL1 ads,' J ENIOR VICE P SIDENT BLT/sfr cc:
NRC Office of Inspection & Enforcement Washington, D.C.