Interim Deficiency Rept,Item E-39 Re Brown Boveri 125-volt Dc Control Device Failure on 6.9 Kv & 4.16 Kv Switchgear. Initially Reported on 830202.Insp & Adjustment of Applicable Circuit Breakers Continuing
ML20082P863
Person / Time
Site: Zimmer
Issue date: 11/29/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, E-39, LOZ-83-0231, LOZ-83-231, NUDOCS 8312090216
Download: ML20082P863 (2)


Text

. p.

Li e

'4.

'I-g* k :

THE CINCINNATI GAS . & ELECTRIC COMPANY CINCINNATI, OHIO 45201 November 29, 1983-LOZ-83-0231 J. WILUAM& JR SsNION YlCE PRES'OENT NUCLEAR OPLAAff0NS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799. Roosevelt Road Glen:Ellyn, Illinois .60137 Attention:- Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55 (e) , ITEM E BROWN BOVERI 125VDC CONTROL DEVICE FAILURE ON 6.9KV AND 4.16KV SWITCHGEAR W.O.-57300, JOB E-5590, FILE NO. 956C, E-39

'This letter constitutes an interim report concerning the subject condition reported to the Commission on February 2, 1983.

This condition represents a reportable deficiency under 10CFR50. 55 (e) .

Our previous report, LOZ-83-0109, submitted August 26, 1983, stated the corrective actions reauired to resolve this condition

! included inspection and adjustment of all-Brown Boveri Electric (BBE) 4.16kV and 6.9kV circuit breakers-per the BBE Instruction J Bulletin IB-8303. However, upon inspection of some of the 4.16kV breakers, it was discovered that they did not all have lever stop i adjustments as shown in IB-8303. It was determined that the P instruction bulletin only addressed HK breaker types 7.5kV' through 15kv, 500'to 750 MVA, 5HK350-3000A and all HKV circuit breakers. A review of circuit breakers at Zimmer indicates'only g 25 of our breakers are of the type which potentially have the reported deficiency. BBE has not experienced any problems with the control devices on the other types of HK circuit breakers.

I Inspection and adjustment of the applicable circuit breakers is continuing. A final report will be submitted upon completion of the corrective actions.

l ih>

{ o%

8312090216 831129

.- h gDRADOCK050oog / 0 'g:-]

gr Mr. J.G. Keppler Regional-Administrator November-29,.1983 LOZ-83-0231 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY s

By 1/l;n

. LLIAMS, 35. ,

SENIOR VICE PRiSIDENT DJS/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz