ML20086G755

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Item Q-14 Re Control of Design Specs.Initially Reported on 831013.Measures to Ensure That Approved Specs Issued as Controlled Documents in Progress. Final Rept Will Be Submitted Upon Completion of Activities
ML20086G755
Person / Time
Site: Zimmer
Issue date: 01/03/1984
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0257, LOZ-83-257, Q-14, NUDOCS 8401120390
Download: ML20086G755 (2)


Text

. - -

66, '

, s. '-h n

THE CINCINNATI GAS & ELECTRIC COMPANY- --

CINCINN ATt, OHIO 45201 January 3, 1984 LOZ-83-0257 e SENIOR VICE PRESIDENT NUCLEAR OPERATIONS -

Docket No.-50-358 U.S. Nuclear Regulatory Commission Region-III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM 0-14, CONTROL OF DESIGN SPECIFICATIONS W.O. 57300, JOB E-5590, FILE NO. 956C, 0-14 This letter constitutes an interim report concerning the subject condition reported to the Commission on October 13, 1983 as a potentially reportable deficiency under 10CFR50.55(e). Our previous report LOZ-83-0207 was submitted November 10, 1983.

Measures to ensure that approved specifications are issued as controlled documents.are in process. These measures include procedure development, for specification review, approval and distribution in accordance with Project Quality Assurance Manual (PQAM), along with a review of~all previously issued specifications and subsequent reissuance as controlled documents.

As' stated previously, all resulting corrective action will be completed prior to commencement of the Plan to verify the Quality l of Construction.

A final report will be submitted upon completion of the above ,

activities.

~

8401120390 840103 JAN 9 1564 PDR ADOCK 05000358 S PDR i

,y' S l

. Mr. J.G. Keppler Regional Administrator

-January 3, 1984 LOZ-83-0257 Page 2 We trust the above will be found acceptable as.an interim report under 10CFR50.55 (e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By ,