- h THE CINCINNATI GAS & ELECTRIC COMPANY dEpTEnNr"T0*,"fh83 LOZ-83-0167 J. WILLIA 148, JR SENIOR vtCE PREseDENT NUCLEAR OPERATeogs Docket No.-50-358 U.S.' Nuclear Regulatory Commission Region III 3
799. Roosevelt Road l
s.f\\
Glen Ellyn, Illinois 60137
\\
Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
.RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M-96, INDETERMINATE QUALIFICATION OF SUPPLIER PER ASME SECTION III i
W.O.
57300, JOB E-5590, FILE NO. 956C, M-96 I
This 1etter constitutes an interim report concerning the
~
subject condition initially reported to the Commission on September 2, 1983 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e).
i CGEE has been notified by its primary contractor, H.J. Kaiser Company (HJK), that Cooperheat, a supplier of subcontracted services as defined by ASME Code,Section III, NB-2600, supplied heat treatment equipment and calibration services without being surveyed and qualified by HJK as required by ASME Code, Section
['
III, NA-3451. -Since Cooperheat has not been surveyed, the quality of products and services supplied by Cooperheat are indeterminate and present a potentially reportable deficiency under 10CFR50.55 (e).
As part of the corrective action to resolve this deficiency, HJK has initiated Corrective Action Request #471 which requires an audit of Cooperheat's f acilities and program.
Also, a preliminary investigation indicates that recording equipment for i;
the heat treating process was supplied and calibrated by subcontractors other than Cooperheat.
Additional time is required to perform this audit and to complete the review of documentation relating to the calibration of the strip chart recorders used in conjunction with the Cooperheat equipment.
The audit is scheduled to oe completed by October 28, 1983, and a follow-up report will be submitted by December 12, 1983.
$b P
OCT 5 1983 9
-a Mr. J.G. Keppler Regional Administrator September 30, 1983 LOZ-83-0167 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By 2
y LLIAMS, JR2 /
SENIOR VICE PRE DENT DJS/RM/sfr cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector ATTN:
T.P. Gwynn NRC Zimmer Project Inspector, Region III ATTN:
E. R. Schweibinz l