n
- N n
L sg
~
THE CINCINNATI GAS & ELECTRIC COMPANY sE CINCINNATI. OHIO 4 52OI November 30, 1983 LOZ-83-0229 J. WILLIAMS, Jpq SENIOR VICE PRESIDENT NWCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M-101; ITT HYDROMOTOR ACTUATOR OIL SEAL LEAKAGE W.O. 57300, JOB E-5590, FILE NO. 956C, M-101 This letter is in regard to the subject condition initially reported to the Commission on November 2, 1983 as a potentially reportable deficiency under 10CFR50.55 (e).
This item is the result of a review of an unresolved CG&E nonconformance report, 81-65-E of 5/6/81, documenting this condition, along with a
. review of correspondence in the 50.55(e) M-14 file concerning HVAC damper actuator deficiencies which was originally identified to CGEE in April 1980, by NRC IE Bulletin 80-09.
CG&E has determined that this condition does not represent a reportable condition under 10CTR50.55(e) since the plant's preventative maintenance program should preclude oil leakage to
'the' point of-failure.
Nevertheless, the following corrective
' actions will be taken to correct the damper actuator deficiencies reported under Item M-14 and including the oil leakage problem:
.l.- Remove the top-and yoke assembly covers and inspect all 110 damper actuators for oil leakage.
2.
On a scheduled basis, remove from service and disassemble those actuators indicating oil leakage and determine probable cause.
3.
Correct any actuator shaft and/or damper linkage misalignment.
4.
Resolve all other damper actuator deficiencies.
yhk 8312090063 831130 PDR ADOCK 05000358
'5 g
S PDR
...-3 Mr. J.G. Keppler Regional Administrator November 30, 1983 LOZ-83-0229' Page 2 L
Corrective work will proceed under the program described in 1
the Course of Action submitted to the NRC on October 5, 1983.
The resolution of the subject condition, as outlined above, will be included in the final report for 50.55(e) M-14 (HVAC Damper Actuator. Deficiencies).
We trust the above will be found to be an acceptable f
resolution of this matter.
[
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY r
By jA
- w1LLlams, ENIOR VICE P ESIDENT BLT/sfr cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Resident Site Supervisor ATTN:
W.M. Hill NRC Zimmer Project Inspector, Region III ATTN:
E. R. Schweibinz i
hi
- - - - - - - - - - -