1h ' g.
Kg
. THE CINCINNATI GAS & ELECTRIC COMPANY CINCINNATI. OHIO 45201 November 10, 1983 LOZ-83-0201 J. WILLIAMS, JR SENIOR VICE PRESIDENT NUCLEAR OPERAT60NS
' Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 i
Attention:
Mr. J.G.'Keppler Regional Administrator Gentlemen:
REs WM..H.
ZIMMER NUCLEAR POWER STATION - ~ UNIT 1 10CFR50.55(e), ITEM M-72, LACK OF A ' QA PROGRAM FOR FIRE PROTECTION SYSTEM INSTALLATION W.O.'57300,' JOB E-5590, FILE'NO. 956C,'M-72 This letter constitutes an interim report concerning the subject condition.' initially reported to the Commission on December 14, 1982.
CG&E has determined that this condition is a reportable deficiency under 50.55 (e).
The condition identifies the lack of a quality assurance program for the design and construction of fire protection systems and components.
In 1977, CG&E committed to provide a quality assurance program in.the Fire Protection Evaluation Report.
This report was in response to Appendix A, Section C of
-the NRC Branch-Technical Position APCSB 9.5-1, but the quality
- assurance aspects of the program were not incorporated into the l
ZPS-1 quality assurance program.
An evaluation of this condition has been completed and is as follows:
j L
This deficiency will require extensive evaluation to ensure l-that the installed fire protection systems and components meet the criteria and-bases of the safety analysis report as committed to in the Fire Protection Evaluation Report; and is therefore
. considered to be significant and reportable.
To resolve this condition, a proposed fire protection quality assurance program based on the Branch Technical Position APCSB 9.5-1 and the NRC's Supplementary Guidance for Fire Protection I
Quality Assurance, dated June 14, 1977, has been developed by L
CGEE.
This quality assurance program is part of the Project Quality Assurance Manual'(Appendix).
This program will apply to all future fire protection work and will b used to develop the b
8311170215 031110 4g PDR ADOCK 05000358
%g p:7}
j S
PDR po _
i.
14r. J.G. Keppler.
Regional Administrator November 10, 1983 LOZ-83-0201 Page 2 acceptance criteria to verify the quality of existing fire protection systems design and installation.
A follow-up report detailing our actions in this matter will be submitted by February 20, 1984.
We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY S?
SENIOR VICE P IDENT BLT/sfr cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Resident Site Supervisor ATTN:
W.M. Hill NRC Zimmer Project Inspector, Region III ATTN:
E. R. Schweibinz
-