ML20079N278

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Item M-104 Re Qualifications of Energy Absorbing Matl Used in Design & Const of High Energy Pipe Whip Restraints.Initially Reported on 831219.Test Procedure Development in Process.Next Rept Due by 840401
ML20079N278
Person / Time
Site: Zimmer
Issue date: 01/17/1984
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
LOZ-84-0003, LOZ-84-3, M-104, NUDOCS 8401300155
Download: ML20079N278 (2)


Text

.

O 'o TIIE CINCINNATI GAS & ELECTRIC COMPANY EEI' CINCINN ATI. OHIO 45201 Ja.naary 17, 1984 LOZ-84-0003 J. WILLI AM S. JR sENeon viCE PRE $1 DENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M-104, ENERGY ABSORBING MATERIAL (EAM) OUALIFICATIONS W.O. 57300, JOB E-5590, FILE NO. 956C, M-104 This letter constitutes an interim report concerning the subject condition reported to the Commission on December 19, 1983 as a potentially reportable deficiency under 10CFR50.55(e).

Energy absorbing material (EAM) used in the design and construction of high energy pipe whip restraints has not been qualified for the angular loading condition for which it is subjected in the design. The 43 EAM assemblies at Zimmer were furnished by the Limco Manufacturing Company and contain energy absorbing material (EAM) manufactured by American Cyanamid Company.

Test procedure development to further qualify the EAM is in process. A report identifying any deficiencies and the corresponding corrective actions as a result of the tests will be submitted by April 1, 1984.

8401300155 840117 PDR ADOCK 05000358

/)

S PDR yri 2 s $3' ll0

  • 'O '

r Mr. J.G. Keppler Regional Administrator January 17, 1984 LOZ-84-0003 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By .

. WILLIAMS, R.

SENIOR VICE P ESIDENT DJS/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweihinz