Text
-
e I
2
['-
ih E
- l. a y d s'
TIIE CINCINNATI GAS & ELECTRIC COMPANY d
CINCINN ATI. OHIO 45206 October 10, 1983 LOZ-83-0177 J. WILLI AM S,.lR SENIOR VICE PRESIDENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM E-35, ELECTRICAL EQUIPMENT FOUNDATION WELDING W.O.
57300, JOB E-5590, FILE NO. 956C, This letter constitutes an interim report concerning the subject condition initially reported to the Commission on January 4, 1983, as a potentially reportable deficiency under the requirements of 10CFR50.55(e).
As stated in our previous letter LOZ-83-0063, dated June 28, 1983.
Henry J. Kaiser Company (HJK) and The Cincinnati Gas &
Electric Company indicated the need to reinspect all essential panel installations for compliance with design document requirements.
HJK has developed and approved two Construction Inspection Plans (CIPs) for the surveillance of paint removal and the inspection of the electrical panel mounting welds.
HJK has been reinspecting the welds utilizing these CIP's.
Foothill Electric Company (FEC) and HJK are scheduled to have the paint removal and inspection effort completed by October 28, 1983.
A follow-up report will be submitted by December 1, 1983.
J l
\\
8310170404 G31010 PCT ' 1 gg(
PDR ADOCK 05000358 3
l
_ g_g 7 S
o
'a.
Mr. J.G. Keppler Regional Administrator October 10, 1983 LOZ-83-0J77 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Very tiuly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By
,[,
,r, i___,
j nI LLI AMS',' J SENIOR VICE PR SIDENT DJS/sfr cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Resident Site Supervisor ATTN:
W.M. Hill NRC Zimmer Project Inspector, Region III ATTN:
E. R. Schweibinz