Interim Deficiency Rept,Item M-32 Re Incomplete Hydraulic Analysis of Control Rod Drive Piping.Verification of Installed Hardware Will Be Completed Under Plan to Verify Quality of Const Submitted 831216
ML20086G707
Person / Time
Site: Zimmer
Issue date: 12/29/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0258, LOZ-83-258, M-32, NUDOCS 8401120365
Download: ML20086G707 (2)


Text

-

f _* - -

THE CINCINNATI GAS & ELECTRIC COMPANY m CINCINN ATI. OHIO 45201 December 29, 1983 LOZ-83-0258 J. WILLIAMS, JR SENIOR WCE PRESf DENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M-32, INCOMPLETE HYDRAULIC ANALYSIS OF CRD PIPING W.O. 57300, JOB E-5590, FILE NO. 956C, M-32 This letter constitutes a follow-up to our final report, OA-1777, dated Apri 29, 1982, concerning the subject deficiency reported to the Commission under 10CFR50.55(e). Our last report, LOZ-83-0065, was submitted June 30, 1983.

Our last report indicated that the remaining corrective actions were the verification of installed hardware and the completion of support modifications. The verification of installed hardware will be completed under the Plan to Verify the Quality of Construction (PVOC), submitted to the Commission on December 16, 1983. The inodifications will then be completed under the Continuation of Construction Plan.

A final report will be submitted upon the completion of the corrective actions.

~8401120365 831229" PDR ADOCK 05000358 S PDR JAN 0 EB4 j f 9"]

-Mr. J.G. Keppler Regional Administrator December 29, 1983 LOZ-83-0258-

'Page 2 We trust the above will be found acceptable as a supplement to the final report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By 2 da- --

. WILL'15A5' JR.

SENIOR VICE PRESIDENT DJS/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz