ML20078J414

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Item E-20 Re Inadequate Cable Tray Hanger Insp.Initially Reported on 820503.Formal Submittal of Proposed Reinsp Program,Including Request for Relaxation of NRC 821112 Show Cause Order,Will Be Made by 831108
ML20078J414
Person / Time
Site: Zimmer
Issue date: 10/10/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, E-20, LO2-83-171, LOZ-83-0171, LOZ-83-171, NUDOCS 8310170448
Download: ML20078J414 (2)


Text

( )

C g ~ =~

THE CINCINNATI GAS & ELECTRIC COMPANY CINCIN N ATI. OHIO 45201 October 10, 1983 LOZ-83-0171 J. WILLIAMS, JR sENaQR VsCE PRES 8 DENT NUCLE AR OPERAftONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM E-20, INADEQUATE CABLE TRAY HANGER INSPECTION W.O. 57300, JOB E-5590, FILE NO. 956C, This letter constitutes an interim report concerning the subject condition initially reported to the Commission on May 3, 1982 as a potentially reportable deficiency under the requirements of 10CFR50.55(e).

Our previous interim report, LOZ-83-0055, dated June 20, 1983, reported that a reinspection program for accessible cable tray hanger and conduit support welds would be made available for NRC review prior to implementation.

On August 11, 1983, the proposed program, which includes sample visual inspections and destructive testing for determining allowable stresses, was presented to the NRC. Formal submittal of the program, including a request for relaxation of the NRC November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" (CLI-8 2-33) per Section IV.B (3) will be made by November 8, 1983.

l l

8310170448 83101 OCT i I EOS' PDR ADOCK 0D000358 S PDR L~ byl 0

l Mr. J.G. Keppler Regional Administrator October 10, 1983 LOZ-83-0171 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By , //, i _ __ '

. ILLIAMS',' 'JR SENIOR VICE PRES DENT RRW/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555

+

NRC Resident Site Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz