Telecopy AO 50-265/75-40:on 751016,during Routine Monthly Surveillance,Three High Drywell Pressure Switches Found to Exceed Tech Spec Limit.Cause Not Stated.Instruments Recalibr & Tested Satisfactorily
ML20084S656
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/17/1975
From: Hooverson O
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S650 List:
References
AO-50-265-75-40, NUDOCS 8306170150
Download: ML20084S656 (1)


Text

'

.. e 7 Co nwealth Edistn

// Oua s Nuclear Power Station

  • l- , Post c Box 21G

"\ Cordova,lihnois 61242

. (., Telephone 309/654-2241 NJK-75-514 -

TELECOPY: Region ill, Attention: Mr. C. Feierabend October 17, 1975 '

J. Keppler, Regional Di rector .

Office of Inspection and Enforcement ,

Region til U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, IL 60137 RE FERENCE: Quad-Cities Nuclear Power Station, . Unit 2 Docket No. 50-265, DPR-30 Appendix .A, Sections 1.0. A.2, 3.1. A, Table 3 1.1.c. , 6.6.B. I .a.

Dear Mr. Keppler:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.I.-a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

On October 16, 1975, during routine monthly surveillance of the High Drywell Pressure-Sensors, three of the four Drywell Pressure Switches were found to exceed the Technical Specification setpoint limit of less than 2.0 P.S.I.

The instruments were immediately recalibrated and tested satisfactorily.

This occurrence was discussed by telephone with Mr. Knop of your office on October 16, 1975 Further information will be provided by Abnormal Occurrence Report A0_40-215/75-40 which will be submitted within 10 days of the date of this occurrence.

Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION N. J. Kallvianakis Station Superintendent NJK:HGL/dkp cc: Office of Nuclear Reactor Regulation ,

G. A. Abrell C306170150 751024' PDR ADOCK 05000265

,S PDR-

,