ML20063N767

From kanterella
Revision as of 05:07, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That FSAR Will Be Submitted by 830701 Instead of 830901.Environ Rept,Security Plan & Antitrust Info Scheduled for 830901
ML20063N767
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/01/1982
From: Dutton D
GEORGIA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8210070168
Download: ML20063N767 (1)


Text

_ - -

ciwa a n ewer ccupany 333 Ped" ent Avew ASada Georga E308 w r;ve a ss.mu Md.h-'Q A0dfCSS ees: c <e ecus 45 4'!a*a G<vg a 30302 Georgia Power D. E. Dutton

, ce r es e.

)

October 1, 1982 Director of Nuclear Reactor Regulation Attention: Darrell G. Eisenhut, Director Division of Project Management U. S. Nuclear Regulatory Comission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT FSAR SCHEDULE

Dear Mr. Eisenhut:

As discussed with Ms. Grant of your staff, we will submit the Vogtle FSAR to you by July 1,1983 instead of September 1,1983 as originally scheduled.

The ER, Security Plan, Emergency Plan and Anti-Trust information is still scheduled for September 1,1983.

Should you have any questions, please advise.

Yours t

%O~ Doug Dutton Vice President Generating Plant Projects sw cc: R. A. Thomas D. O. Foster

0. Batum J. A. Bailey J. M. Grant M. Malcom J. L. Vota  % D Ol M. Manry L. T. Gucwa G. E. Trowbridge 8210070168 821001 PDR ADOCK 05000424 A PDR