Responds to NRC 790705 Ltr Re Violations Noted in IE Insp Repts 50-424/79-11 & 50-425/79-11.Corrective Actions:Pan Dry Method of Testing Will Be Utilized for Future Tests W/Addl Matl Taken from Test Hole for Oven Dry Analysis
ML19274F969
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/31/1979
From: Dutton D
GEORGIA POWER CO.
To: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19274F967 List:
References
GM-480, NUDOCS 7908270242
Download: ML19274F969 (2)


Text

. .

s1'j}RC

.- E ,

. NT '

Georgia Power Company Post Off.ce Box 4545 p { +, { 3 h Atlanta, Georgia 3o302 Telephone 404 522-ww

g gM Vogtle Project Southern Company Servces, Inc.

Post Offce Box 2625 Birmengham, Alabama 352o2 Telephone 205 870-6011 July 31, 1979 United States Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement IE: II: JRH Region II - Suite 3100 50-424/79-11 101 Marietta Street 50-425/79-11 Atlanta, GA 30303 File: X7BG10 Log: GM-480 ATTENTION: Mr. C. E. Murphy Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the noncompliances discussed in your inspection report number 50-424/79-11 and 50-425/79-11.

A) Infraction " Backfill Moisture Control" The Bechtel Power Corporation has reviewed the data for the questionable backfill and have detcrmined that the backfill meets their speci-fication requirements. The " oven dry" method has always been used in parallel with the " speedy" method and was the criterion for final acceptance of back-fill placed. The "speedie" moisture machine testing has been deleted as a method of testing backfill at Plant Vogtle Units 1 & 2. The " pan dry" method of testing will be utilized for future tests with additional material taken from one of the test holes for an " oven dry" analysis. The results of the

" oven dry analysis" will be plotted with the results of the " pan dry" tests and will form tt:? basis for final acceptance. The construction specification and field procedure CD-T-01 will be clarified to alleviate future problems in this area.

B1 Deficiency " Backfill Work Stoppage" A " Work Stop Order" was issued June 13, 1979 for Category I backfill. This order was rescinded on July 27, 1979 after Bechtel Power Corporation reviewed and accepted test data for the backfill. Additional training has been implemented in the area of work stoppage.

Georgia Power is presently in full compliance.

7 9 08 2 7 09-D f 14d/JQ

~ .

. United States Nuclear Regulatory Commission Mr. C. E. Murphy July 31, 1979 Page Two Neither the inspection report nor this reply contain any proprietary information and may be placed in the NRC's Public Document Rooms.

Very trul ours, '

D- \ _

WDoug %DuttonW5 I i

Project General Manager CWH:tp xc: H.D. Hunt - Region II J. H. Miller, Jr.

W. E. Ehrensperger F. G. Mitchell, Jr.

C. F. Whitmer R. J. Kelly R. W. Staffa C. W. Hayes W. l1. Johnston, Jr.

C. R. Miles, Jr.

D. L. ItCrary R. A. Thomas J. A. Bailey J. L. Leamon H. A. Sindt B. L. Lex K. M. Gillespie

- -,