ML17264A604

From kanterella
Revision as of 17:04, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for July 1996 for Re Ginna Nuclear Power Plant.W/960813 Ltr
ML17264A604
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1996
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9609240200
Download: ML17264A604 (6)


Text

CATEGORY 1 REGULAT INFORMATION DZSTRZBUTIOIIZSTEN (RIDE)

E2:CESSION NBR:9609240200 DOC.DATE: 96/07/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT. AFFILIATION VISSING,G.S.

'I

SUBJECT:

Monthly operating rept for July 1996 for RE Ginna Nuclear Power Plant.W/960813 ltr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

J ENCL I SIZE:

E NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 G

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSINGFG. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 ILE C 1 1 NRR/DRPM/PECB ,1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

M N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR, DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL- 9

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 Cgf'D Q% S aaci -ooc ia 546.2700 August 13, 1996 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for July, 1996 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July, 1996. Included in this report is the documentation of a challenge to the pressurizer power operated relief valves which occurred on July 4, 1996.

Very truly ours, s h .A. Wi~

Plant Manage xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission Mr. W.H. Lovelace MNBB 7602 Washington, D.C. 20555 U.S. NRC Ginna Senior Resident Inspector Attachments 9609240200 960731 t PDR ADOCK 05000244.

R PDR

PERATING DATA REPORT 50-244 u ust 13 1996 COMPLETED BY V John V. Walden TELEPHO E (716) 771-3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: Jul 1996
3. Licensed Thermal Power (MWI): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An .

This Month Yr.-to.Date Cumulative"

11. Hours in Reported Period 744.0 5111.0 233879.0
12. Number of hours Reactor Was Critical 649.5 3262.0 186929.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 644.6 3213.2 '83961.9
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 928606.0 4632914.0 '61496222.0
17. Gross Electrical Energy Generated (MWH) 310129.0 1569853.0 86632353.0
18. Net Electrical Energy Generated (MWH) 294668.0 1491973.0 82239785.0
19. Unit Service Factor (%) 86.6 62.9 78.7
20. Unit AvailabilityFactor (%) 86.6 62.9 78.7
21. Unit Capacity Factor (using MDC Net) (%) 62.1 75.9
22. Unit Capacity Factor (using DER Net) (%) 62.1 75.9
23. Unit Forced Outage Rate (%) 13.4 5.4 5.5
24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Au ust 13 1996 COMPLETED BY: ale John Walden TELEPHONE: 716 771-3588 MONTH Jul 1996 DAY AVERAGE DAILY POWER LEVEL 2.

(MWe-Net) 484 482 F

17 '80 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 480

3. 168 19. 482
4. 20. 482
5. 21. 484
6. 22. 483
7. 23. 314
8. 180 24. 481 9.

10.

12.

486'8.

482 483 483 484 25.

26.

27.

28.

483 481 480 480

13. 486 29. 481
14. 486 30. 488
15. 31. 494
16. 484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

l)O(:Kl'.T NO.

UNIl NAMI'. R E. (8INNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS I)ATE " 3 1996

(:OMPLI TI:.I) IIY John V.'alcCen 1'I:LEPlloNE 716 771-3588 e~

oco 0

Licensee C

~I ln Cause 8 Corrective C Ew Ho. Dote 4

.o 4ss 0

0 Vl 0

oto

> cc Event 0 0 Vl Q C, 0 Q Action to I d~QX 4(A a Report II an o

o so Prevent Recurrence o

d0 7/3/96 '99.4 Pressurizer safety ~alve began leaking while the unit was at full power. The unit was placed in mode 5 for valve maintenance.

7 />1 /96 F l7.6 Leaking containment spray test line caused an administrative power reduction. Repair activities stopped the leak and halted the power reduction prior to going off-line.

2 3 F: Forced Reason: hfethod: Exhibit (i - Instructions St Scheduled h-Equipment Failure (Explain) I -hfanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Rcport (Ll!R) I'lc (NllRI (-

D-Regulatory Restriction /I-Other (Explain) 0161)

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

Rtv 4/89 i9.89 H-Other (Explain) I'.xhibit I - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Qinna Nuclear Power Plant DATE: Au ust 13 1996 COMPLETED BY: v v2d John Walden TELEPHONE: 716 771-3588 MONTH Jul 1996 The unit began the month at full power. On July 3, 1996, a pressurizer safety valve began to leak. The unit was manually shut down and placed in mode 5. The reactor coolant system was drained= and safety valve replaced with a spare. While in mode 4, reactor coolant system pressure reached the activation setpoint of the low temperature overpressure protection system. Pressurizer power operated relief valves 430 and 431C opened momentarily and reduced reactor coolant system pressure. The remainder of the start up activities proceeded normally. The unit was placed on-line on July 8, 1996. Full power operations continued from July 9, 1996 to July 23, 1996. A power reduction occurred on July 23, 1996 due to a leaking containment spray test line. The power reduction was halted when the condition was cleared. The unit was brought back to full power on July 24, 1996 and remained there for the rest of the month.