ML17265A729

From kanterella
Jump to navigation Jump to search
Interim Part 21 Rept Re safety-related DB-25 Breaker Mechanism Procured from W Did Not Pas Degradatin Checks When Drawn from Stock to Be Installed Into BUS15/03A.Holes Did Not line-up & Tripper Pan Bent
ML17265A729
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/29/1999
From: Popp B, Torkell C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC
Shared Package
ML17265A728 List:
References
REF-PT21-99 NUDOCS 9908090058
Download: ML17265A729 (2)


Text

10CFR21 Substantial Safety Hazard Evaluation Interim Report R.E. GINNA NUCLEAR POWER PLANT

1. DISCOVERY DATE: 6/18/99
2. DESCRIPTION OF DEFICIENCY:

A safety related DB-25 Breaker Mechanism, procured from Westinghouse, did not pass degradation checks when drawn from stock to be installed into Bus15/03A. The Breaker Mechanism has holes drilled that do not line-up, causing the pin above the toggle lever to be out of alignment. Also, the right rear quarter section of the tripper pan is bent upward, giving us unsatisfactory tripper bar gaps.

3.

REFERENCES:

Rochester Gas Ec Electric Purchase Order NQ-15795-A-JW

4. DATE WHEN EVALUATIONWILLBE COMPLETED:

A purchase requisition has been sent to Westinghouse for a failure mode assessment.

It is estimated that the evaluation will be completed by December 1,1999.

Prepared By. Date: 7-~<->'F E<ngineer Reviewed By. Date: 2 '>M'VF.

Engineering Manager or d ignee Approved By. D,. 7-3 j-1g PORC Chairman

'H08090058 990730 PDR ADOCK 05000244 8 PDR