CATEGORY j.

REGULAT INFORMATION DISTRIBUTION'STEM (RIDE) i1 ACCESSION NBR:9709170126 DOC.DATE: 97/08/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME i AUTHOR AFFILIATION WALDEN,J.W. Rochester Gas & Electric Corp'.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSINGFG.S.

SUBJECT:

Monthly operating rept for Aug 1997 for RE Ginna Nuclear Power Plant.W/970911 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD VISSINGFG.

~

1 1 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E 01 ~

1 1 NRR/DRPM/PECB 1 1 1 1 RGNl 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~ rr zzizzzu g i'~rj'Z(l iZZiruZ sizzs~zt iilsizlzd izzzszl ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TCLCPHONC ARCA COOC 7ld 546-2700 September 11, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for August, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of August, 1997.

Very truly yours, a..d s h A. Widay Plant Manager xc: U. S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 97o9~7~~~~, q7O831 pDR PDQGK- OGOOO2~+

pDR R

lllllilllllllllllllllllllllllilllillllll

50-244 Se tember11 1997 COMPLETED BY V John V. Watden TELEPHONE (716) 771-3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: Au ust 1997
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 480
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative*'1.

Hours in Reported Period 744.0 5831.0 243383.0

12. Number of hours Reactor Was Critical 744.0 5831.0 195745.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On. line 744.0 5831.0 '92757.5
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 1128199.0 8806597.0 274682867.0
17. Gross Electrical Energy Generated (MWH) 379357.0 3000951.0 91111260.0
18. Net Electrical Energy Generated (MWH) 361041.0 2857980.0 86503846.8
19. Unit Service Factor (%) 100.0 100.0 79.2
20. Unit AvailabilityFactor (%) 100.0 100.0 79.2
21. Unit Capacity Factor (using MDC Net) (%) 101.1 102.1 76.6
22. Unit Capacity Factor (using DER Net) (%) 103.2 104.3 76.6
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

The refuelin and maintenance outa e is scheduled for October 20 1997. The Ianned duration is 23 da s.

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION CUMULATIVETOTAL COMMENCING JANUARY 1, 1975 "CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

Cl

~ ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Se tember 11 1997 COMPLETED BY:

John V. Walden TELEPHONE: 16 771-3588 MONTH Au ust 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 483 3.7 ~ 483

2. 484 18. 483
3. 483 19. 482
4. 483 20. 485
5. 483 21. 497
6. 482 22. 497

,7 ~ 482 23. 495

8. 482 24. 489
9. 482 25. 491
10. 483 26. 493 483 27, ~ 492
12. 482 28. 490
13. 482 29. 488
14. 483 30 ~ 488
15. 484 31. 489
16. 484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO: 50-244 COMPLETED BY:

D:

UNIT: R.E. GINNA NUCLEAR POWER PLANT Se tember 11 1990 John P. Walden UNIT SHUTDOWN AND POWER REDUCTIONS 0

No. Date Type Duration Reason'ethod of Licensee Code'omponent System Code'ause & Corrective Action to (hours) shuting down Event Prevent Recurrence reactors Report 0 1

F: Forced 2 S: Scheduled Reason: 3 4 A-Equipment (Explain) Method: Exhibit G - Instructions B-Maintenance or Test 1-Manual for Preparation of Data C-Refueling 2-Manual Scram. Entry Sheets for D-Regulatory 3-Automatic Scram. Licensee Event Report E-Operator Training & 4-Other (Explain) (LER) File (NUREG-Lecensee Examination 0161)

F-Administrative G-Operational Error (Explain)

H-Other (Explain) 5 Exhibit 1- Same Source

S H

C