CATEGORY 1 REGULATO+INFORMATION DISTRIBUTION +TEN (RIDE)

ACC"SSION NBR:9708180264 DOC.DATE: 97/07/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION NORTON,B.A. Rochester Gas s Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jul 1997 for Ginna Station.

W/970813 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

/ENCL g SIZE:

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 E

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSING,G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 01 1 1 NRR/DRPM/PECB 1 1 1 1 RGN1 3. Y EXTERNAL LITCO BRYCE F J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Q foal

~ 1g -. II" ZZZZZZZ '

"/ll(IIISZ/ QAlk& MEM ZZig)ge uuN(E PiVSWZ liZZZiZZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 8P TELEPHONE AREA CODE 7l6 546.2700 August 13, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for July, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July, 1997.

Very truly yours, cL d.

J s h A. Wida a t Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

'IIIIIIIIIII!IIIIIIIII!IIIIIIIIIIIIIIIIj

~Q vQ Q~Q 9708i80264 97073i PDR ADQCK 05000244 R 'DR

I I

~f eS l a I'

50-244 COMPLETED BY:

Benjamin A. Norton TELEPHONE (716) 771-3653

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: Ju 1997
3. Licensed Thermal Power (MWI): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 480
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report. Give Reason:
9. Power Level to Which Restricted, IfAny (Net MWe):
10. Reason For Restrictions, If An:

This Month Yr.-to.Date Cumulative"

11. Hours in Reported Period 744.0 508?.0 242639.0
12. Number of hours Reactor Was Critical 744.0 5087.0 195001.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6 *
14. Hours Generator On-line 744.0 5087.0 192013.5
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 1128410.0 7678398.0 273554668.0
17. Gross Electrical Energy Generated (MWH) 380900.0 2621594.0 90731903.0
18. Net Electrical Energy Generated (MWH) 362656.0 2496939.0 86142805.8
19. Unit Service Factor (%) 100.0 100.0 79.1
20. Unit Availability Factor (%) 100.0 100.0 79.1
21. Unit Capacity Factor (using MDC Net) (%) 101.6 102.3 76.5
22. Unit Capacity Factor (using DER Net) (%) 103.7 104.4 76.6
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Therefuelin andmaintenanceouta eisscheduledforOctober20 1997. The lanneddurationis22da s.

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975 "CUMUlATIVETOTAL COMMENCING NOVEMBER 8, 1969

I CI

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Au ust 13 1997 COMPLETED BY: . ~~~

Benjamin A. Norton TELEPHONE: 716 771-3653 MONTH Jul 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 489 17. 485 490 18. 482

3. 489 19. 482 486 20. 483
5. 487 21. 483
6. 486 22. 486
7. 487 23. 491 8 ~ 490 24. 497
9. 491 25. 497
10. 490 26. 498 487 27. 495
12. 488 28. 491
13. 489 29. 484
14. 487 30. 483
15. 487 31. 482
16. 487 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

~

I 1

4 I I

4 t

DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY:

Benjamin A. Norton N

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH ~Jul 1997 No. Date Type Duration Reason'ethod of Code'omponent System Code'ause & Corrective Action to (hours) reactors'icensee shuting down Event Prevent Recurrence Report ¹ 1

F: Forced 2 S: Scheduled Reason: 3 4 A-Equipment (Explain) Method: Exhibit G - Instructions B-Maintenance or Test 1-Manual for Preparation of Data C-Refueling 2-Manual Scram. Entry Sheets for D-Regulatory 3-Automatic Scram. Licensee Event Report E-Operator Training & 4-Other (Explain) (LER) File (NUREG-Lecensee Examination 0161)

F-Administrative G-Operational Error (Explain)

H-Other (Explain) 5 Exhibit 1- Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Au ust 13 1997 COMPLETED BY:

Benjamin A. Norton TELEPHONE: 716 771-3653 MONTH Jul 1997 The unit operated at full power for the entire month of July. The average power level was 99.8'%

Page1 of 2 RG&E GINNA STATION OPERATIONS RECORDS OPERATING

SUMMARY

Category 3.4.8 July, 1997 Reviewed by MONTH YEAR TO DATE GROSS GENERATION MWH 380900.0 2621594.0 90731903.0

¹11 TRANSFORMER MWH 16721.0 115613.0 4241560.0

¹12A TRANSFORMER MWH 562.0 3519.0 283931.4

¹12B TRANSFORMER MWH 961.0 5523.0 63605.8

¹11 AND ¹12 TRANSFORMER, ON LINE MWH 18244.0 124655.0 4589097.2 NET GENERATION ON LINE MWH 362656.0 2496939.0 86142805.8

¹11 TRANSFORMER, OFF LINE MWH 0.0 0.0 3958.0

¹12A TRANSFORMERS, OFF LINE MWH 0.0 0.0 264301.8

¹12B TRANSFORMER, OFF LINE MWH 0.0 0.0 47324.0 AVERAGE GENERATION/HR GROSS MW 512.0 515.4 472.5 TOTAL STATION SERVICE / GROSS GENERATION 0.0 0.0 0.1 ON LINE HOURS 744.0 5087.0 192013.5 OFF LINE HOURS 0.0 0.0 50625.4 TOTAL HOURS 744.0 5087.0 242639.0 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 8.5 "Cumlative Total Commencing January 1, 1975

'ross Plant Efficiency 33.8 34.1 33.2 Gross Plant Heat Rate BTU/KWH 10111.0 9996.4 10290.1 Unit Operating Factor 99.8 99.3 75.8 Unit Service Factor 100.0 100.0 79.1 Unit Availability Factor 100.0 100.0 79.1 Unit Capacity Factor 101.6 102.3 76.5

4

~ ~

l'

Page2of2 RG8 E GINNA STATION OPERATIONS RECORDS OPERATING

SUMMARY

Category 3.4.8 July, 1997 Reviewed by NUCLEAR MONTH YEAR TO DATE NUCLEAR PLANT OPERATION (HOURS) 744.0 5087.0 195001.3 NUCLEAR PLANT SHUTDOWN (HOURS) 0.0 0.0 46352.6 REACTOR RESERVE SHUTDOWN (HOURS) 0.0 0.0 1687.6 NUCLEAR PLANT TOTAL (HOURS) 744.0 5087.0 '43041.5 NUMBER OF CRITICALITIES 0.0 0.0 385.0 NUMBER OF SHUTDOWNS a) Normal 0.0 0.0 279.0 b)Trips 0.0 0.0 105.0 c)Total 0.0 0.0 384.0 GROSS THERMAL MWTh 1128410.0 7678398.0 273554668 EQUIVALENTFULL POWER (HOURS) 742.4 5050.6 181908.0 Cumulative Total Commencing January 1, 1975 Reactor Service Factor 100.0 100.0 80.2 Reactor Availability Factor 100.0 100.0 80.9 UNIT FORCED OUTAGES Unit Forced Outage (Hours) 0.0 0.0 11446.7 Unit Forced Outage Rate 0.0 0.0 5.6 NOTE: This form has been revised to be consistent with U.S. Nuclear Regulatory Guide 1.6, Appendix A, Rev. 4, Aug. 1975 Titled "Reporting of Operating Information"- Technical Specifications

JULY 1997 100 ~

Q~ N~R~Q 8 N~R0 %~IS %~~~%

80 gO 60 0

40 20 0 e 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 Date

.L S ~

7 Jl P

'l e