Monthly Operating Rept for Sept 1996 for Re Ginna Nuclear Power Plant.W/961009 Ltr
ML17264A688
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1996
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9610160357
Download: ML17264A688 (8)


Text

CATEGORY 1 REGULA'Y ZNFORMATZON, DZSTRZBUTZORYSTEM (RZDS)

Al,",CESM~ ON NBR:9610160357 DOC.DATE: 96/09/30 NOTARIZED: NO DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFIDIATION VISSING,G.S.

P

SUBJECT:

Monthly operating rept for Sept 1996 for R.E. Ginna Nuclear Power Plant.W/961009 ltr.

A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD1-1 PD 1 1 VISSING,G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FIL R 1 1 NRR/DRPM/PECB 1 1 RGNl 1 '1 Y EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1

NRC PDR 1 1 D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

lk i A

I IF Pl E

fl

~I' I

I

4J RKR r(Ptgttt t'tKKtt a~ t Oats ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TKL KPNONK ARK* COOK 7IK 546.2700 October 9, 1996 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for September, 1996 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna,Improved Technical Specifications Section 5.6.4, attached is the monthly operating status, report for Ginna Station for the month of September, 1996.

Very truly yours, c(.. d s h A. Wida an Manager xc: U. S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 9'hiOih0357 960930 PDR ADQCK 05000244 R PDR

~800g~

OPERATING DATA REPORT 50-244 ober9 199 COMPLETED BY:

John V. Walden TELEPHO E (716) 771-3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: Se tember 1996
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur In Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any(Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative**

11. Hours in Reported Period 720.0 6575.0 235343.0
12. Number of hours Reactor Was Critical 636.6 4501.4 188168.5
13. Reactor Reserve Shutdovm Hours 0.0 0.0 1687.6
14. Hours Generator On. line 634.3 4439.5 '85188.2
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 941428.0 6440531.0 '63303839.0
17. Gross Electrical Energy Generated (MWH) 314620.0 2170168.0 87232668.0
18. Net Electrical Energy Generated (MWH) 299243.2 2062620.2 82810432.2
19. Unit Service Factor (%) 88.1 67.5 78.7
20. Unit Availability Factor (%) 88.1 67.5 78.7
21. Unit Capacity Factor (using MDC Net) (%) 88.4 66.7 75.9
22. Unit Capacity Factor (using DER Net) (%) 88.4 66.7 75.9
23. Unit Forced Outage Rate (%) 11.9 9.2 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. It Shutdown At End of Report Period, Estimate Date ot Startup:
26. Units in Test Status (Prior to Commercial Operation): Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

'* CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: October 9 1996 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH Se tember 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 480 17. 482

2. 479 18. 483 475 19. 484 475 20. 484
5. 476 21. 484
6. 475 22. 486

'2

7. 23. 486
8. 24. 486
9. 25. 487 10 26. 487

'l. 353 27. 490

12. 480 28. 491
13. 482 29 ~ 489 14 ~ 482 30. 489
15. 483 31.
16. 482 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO. SO-'244 UNIT NAhll'. R E. GINNA NUCLEAR POWER PIANT UNIT SHUTDOWN AND POWER REDUCTIONS>>ATI.: J COhIPLI'.l I'.D IIY ohn V. Vfalden Pk I

Pl e 0 o- a 0 C E u Licensee Ew C Cause g Corrective 0 Event 0 D Ho. Date D > lc 0 Q Action to 0 0 0 o 0o ~

X 0 tL our c Report L lA O

Prevent Recurrence 0

lh 10 9/7/96 F 85.7 A leaking safety injection test line relief valve and a steam leak on a main feedwater block valve caused a forced shutdown to allow repairs to take place.

F: Forced Reason: hlcthod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -hlanual for Preparation of Data B-hlaintenance or Test 2-Manual Scram. Entry Shccts for Liccnscc C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) OI6I)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

Rtv. 4ISS 4949 H-Other (Explain) Exhibit I - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: October 9 1996 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH Se tember 1996 The unit began the month at full power. A manual shutdown of the unit on September 6, 1996 was initiated due to a leaking safety injection test line relief valve and a secondary system steam leak. The unit was placed on-line on September 10, 1996 following completion of repairs.'ull power operations continued from September 11, 1996 through the end of the month.