CATEGORY 1 REGULAT ci INFORMATION DISTRIBUTION STEM (RIDS)

ACGESNION NBR:9612180076 DOC.DATE: 96/ll/30 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,W. Rochester Gas a Electric Corp.

WIDAYtJ.A Rochester Gas a Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSINGiG.S.

SUBJECT:

Monthly operating rept for Nov 1996 for Ginna Station.

W/96121'1 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTESLicense Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 8

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSING,G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CENTER 1 1 1 NRR/DRPM/PECB 1 1 OC/DBA/PAD 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCEgJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL . '.10

~ g ~uziiuzzpzz

'IIII"'~Z iuZZZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TKLEPHONf AREA coDc 7I4 546-2700 December 11, 1996 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for November, 1996 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November, 1996.

Very truly yours, seph A. Wid Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C. 20555 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.l'S". NRC Ginna Senior Resident Inspector Attachments

'P6i2i80076 96i i30 PDR ADOCK 05000244 R PDR

I 7 OPERATING DATA REPORT 50-244 De mber 11 1996 COMPLETED BY:

John V. Walden TELEPHO (716) 771-3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: November 1996 3, Licensed Thermal Power (MWI): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to.Date Cumulative**

11. Hours in Reported Period 720.0 8040.0 236808.0
12. Number of hours Reactor Was Critical 444.7 5503.2 189170.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 437.3 5433.8 186182.5
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 648596.0 7883691.0 '64746999.0
17. Gross Electrical Energy Generated (MWH) 221450.0 2661410.0 87723910.0
18. Net Electrical Energy Generated (MWH) 210915.6 2529839.8 83277651.8
19. Unit Service Factor (%) 60.7 67.6 78.6
20. Unit Availability Factor (%) 60.7 67.6 78.6
21. Unit Capacity Factor (using MDC Net) (%) 62.3 66.9 75.9
22. Unit Capacity Factor (using DER Net) (%) 62.3 66.9 75.9
23. Unit Forced Outage Rate (%) 39.3 14.5 5.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. I(Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRIT(CALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:, 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: December 11 1996 COMPLETED BY:

John Walden TELEPHONE: 6 771-3588 MONTH November 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 494
2. 18. 494
3. 19. 495
20. 495
21. 496
6. 22. 496
7. 23. 496
24. 495
9. -10 25. 495
10. -10 26. 495

-10 27. 495

12. 13 28. 495
13. 353 29. 495 14 ~ 495 30. 496
15. 494 31.
16. 494 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO.

tJNI1 NAMI R E CilNNA NUCLEAR POWER PLANT DA1 E 9.6 UNIT SHUTDOWN AND POWER REDUCTIONS (;OhIP LI:.1'I'.D I3Y ohn Walden REPORT hlONTH 1996 1 I:LI:P)ION ( 716) 771-3588 ohio

.o e CV c

0 ocuo-0 cn Ltcensee Ew 0

C 0 lA C

Cause 5 Correchve Ho. Date o o Ill Event 0 0 Q

Action to O > o I/l 0 Prevent Recurrence

~

o X O Report tI O~

tt.'l' CL O 0

CI lf) /24 /tl6 F 470.9 Iridication of a main trans-former hot spot caused a forced shutdown. Replacement of main transformer with spare is complete.

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) I -hlanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Liccnscc C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NURF(-

D-Regulatory Restriction 4-Other (Explain) OI 61)

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) Exhibit I - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: December 11 1996 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH November 1996 Replacement of the main transformer was completed. The unit was placed on line on November 12, 1996. Full power was reached on November 13, 1996. The unit remained at full power for the remainder of the month.