ACCESSION NBR:9602130072 DOC.DATE:'TARIZED: NO DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas a Electric Corp.

WIDAY,J.A. Rochester Gas~& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly Power operat'or.4 Plant 960207 1 Jan 1996 for R.E. Ginna Nuclear A

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 050'00244 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 NRR/DRPM/PECB 1 1 RGNl 1 1 EXTERNAL: LITCO BRYCEgJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEt CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:,'TTR ,',, 9 ENCL > ~ 9;.

1

if ISSS q fffffffffffff 0 rti ~ oal ~ r(r

/ '.

ZP

>orr EÃ 1 fffffffffffff SLAM ROCHESTER GAS AND ELECTRIC CORPORATION o e9 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKLKPHONK ARKA COOK 7IK 546-2700 GINNA STATION February 7, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for January, 1996 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1996.

Very truly yours,

a. Lj s h A. Wi Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC. (1) 3.30065 r

R,PDR 9602i30072 960i31 PDR ADOCK 05000244 g l

OPERATING DATA REPO 50-244 Februa 7 1996 COMPLETED BY:

John V. Walden TELEPHONE (716) 7714588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period: Janua 1996
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Ca pacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative"

11. Hours in Reported Period 744.0 744.0 229512.0
12. Number of hours Reactor Was Critical 744.0 744.0 184411.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 744.0 744.0 '81492.7
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 1096191.0 1096191.0 '57959499.0
17. Gross Electrical Energy Generated (MWH) 373104.0 373104.0 85435604.0
18. Net Electrical Energy Generated (MWH) 354741.0 354741.0 81102553.0
19. Unit Service Factor (%) 100.0 100.0 79.1
20. Unit Availability Factor (%) 100.0 100.0 79.1
21. Unit Capacity Factor (using MDC Net) (%) 101.4 101.4 76.3
22. Unit Capacity Factor (using DER Net) (%) 101.4 101.4 76.3
23. Unit Forced Outage Rate (%) 0.0 0.0 5.5
24. Shutdowns Scheduled Over Next 6Months(Type, Dateand Duration of Each):

Refuelin and Maintenance Start 4/01196 Duration 62 da

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Februa 7 1996 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH Januar 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 477 17. 477

2. 476 18. 477
3. 476 19. 477
4. 476 20. 477
5. 476 21. 477
6. 476 22. 477
7. 476 23. 477
8. 476 24. 477
9. 476 25. 477
10. 476 26. 476 476 27. 477
12. 476 28. 476
13. 476 29. 476
14. 476 30 ~ 476
15. 476 31. 476
16. 476 INSTRUCTIONS On this format, for each list inthe average daily unit power level in MWe-Net day reporting month. Compute to the nearest whole megawatt.

DO(:KET NO. ~0 244 R E GINNA NUCLEAR POWER PLA UNIT SHUTDOWN AND POWER REDUCTIONS DA1 I F r

(:OhlPLI'.1'I'.D BY ohn V. Walden REPORT MONTH J>nu><V, 1996 1I:LI:PHON -

(716) 771-3588 h

CV c

08 0 c u L'icensee Em c

O Ill Cause fh Corrective 0 c Ho. Date 0 0 0 0

Vl 0

ot 0 e Event ~ 0 vl 0 0 D 0

E 0 Action to Report t 0 Prevent Recurrence

~

I- O~ O own c EA 0

V O

1 3

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 14tanual for Preparation of Data B-Maintenance or Test 2-hlanual Scram. Entry Sheets for Liccnscc C-Refueling 3-Automatic Scratn. Event Rcport (LER) File (NURFG-D-Regulatory Restriction 4-Other (Explain) 01 Cil )

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Exhibit I - Same Source

NMGGRTIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: F b ua 7 1996 COMPLETED BY:

John Walden TELEPHONE: 716 71-3588 MONTH Januar 1996 Average power for the month was 97%.