Monthly Operating Rept for July 1999 for Re Ginna Npp.With
ML17265A734
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1999
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9908160064
Download: ML17265A734 (5)


Text

't I ~

REGULA'J.

Y INFORMATION DISTRXBUTIO SYSTEM (RIDS)

ACCESSION NBR:9908160064 DOC.DATE: 99/07/31 NOTARIZED: NO FACIL:50-244,Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTEUR;NA>W AUTHOR AFFILIATION WALDEN,u.V; Rochester Gas

& Electric Corp.

WIDAY,J.A.

Rochester Gas R Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000244 VISSING,G.S.

SUBJECT:

Monthly operating rept for July 1999 for RE Ginna NPP.With 990806 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

J E

05000244 G

RECIPIENT ID CODE/NAME VISSI G

INTERNAL:

E CgKTZR 0

RES DRAA/OERAB EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECXPIENT ID CODE/NAME OC/DBA/PAD RGNl NOAC COPIES LTTR ENCL 1

1

.1 1

1 0

R Y

0

'E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL 8

ROCHESTER GAS ANDELECTRIC CORPORATION 89 EASTAVENLIE, ROCHESTER, N.Y. 14649-00D1 AREA CODE 716-546-2700 August 6, 1999 US Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for July, 1999 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July, 1999.

Very truly yours, g,.d J

se A. Wida Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate l-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments VV08<~00S4 Se073<

PDR ADQCK 05000244

)

R PDR

OPERATING DATAREPORT COMPLETED BY:

50-244 August 6, 1999 John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480

1. Unit Name:

R.E. GINNANUCLEARPOWER PLANT

2. Reporting Period:

Jul, 1999 3.

Design Electric Rating (Net MWe):

470 4.

Maximum Dependable Capacity (Net MWe):

Notes:

This Month Yr.-to-Date Cumulative**

5. Number of hours Reactor Was Critical
6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electrical Energy Generated (MWH) 744.0 744.0 0.0 356880.0 3821.8 3772.2 0.0 1744098.0 210541.0 207470.9 8.5 93595178.4
    • CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969

UNIT SHUTDOWN DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER P ANT DATE: Au ust 6 1999 COMPLETED BY:

John V. Walg.an 4

REPORTING PERIOD:

Jul 1999 (IVlonth/Year)

DATE TYPE F: FORCED S:SCHEDULED DURATION (HOURS)

REASON(')

METHOD OF SHUTTING DOWN(>>

CAUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit operated at full power for the entire month of July. Average power for the month was 99.6%.

(1) Reason A-Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

O.

O.

~ ~~-

r P A