Monthly Operating Rept for Sept 1999 for Re Ginna Npp.With
ML17265A762
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1999
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9910150057
Download: ML17265A762 (6)


Text

C~

~

REGULA'Y INFORMATION DZSTRZBUTZ s.

SYSTEM (RZDS)

ACCESSION NBR:9910150057 DOC.DATE: 99/09/30 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH NBA ',i~

AUTHOR AFEILIATZON WALDEN,J.V.

Rochester Gas

& Electric Corp.

WIDAY,J.A.

Rochester Gas

& Electric Corp.

RECZP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Monthly operating rept for Sept 1999 for RE Ginna NPP.With 991008 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR i ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)

E 05000244 6

RECIPIENT ID CODE/NAME VISSING,G INTERNAL: 'FILE CENTER 01 RES/DRAA/OERAB EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME OC/DBA/PAD RGN1 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 D

ill

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL 8

AaO ROCHESTER GAS ANDELECTRIC CORPORATION 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 AREA CODE 716-546-2700 October 8, 1999 US Nuclear Regulatory Commission Document Control Desk Attn:,Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for September, 1999 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of September, 1999.

Very truly yours, g., Lj se A. Widay Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate l-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments l

99%0i50057 990930 cow aoacx asooozee

)

R PDR

OPERATING DATAREPORT 50-244 October 8, 1999 COMPLETED BY:

SpyE John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

Se tember, 1999 3.

Design Electric Rating (Net MWe):

470 4.

Maximum Dependable Capacity (Net MWe):

Notes:

This Month Yr.-to-Date Cumulative**

5. Number of hours Reactor Was Critical
6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electrical Energy Generated (MWH) 720.0 720.0 0.0 348684.0 5285.8 5236.2 0.0 2450949.0 212005.0 208934.9 8 5 94302029.4
    • CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNANUCLEAR POWER PLANT DATE. October 8 1999 COMPLETED BY: John V. Walden TELEPHDNEJ7716 7 1-UNITSHUTDOWN REPORTING PERIOD:

Se tember 1999 (Month/Year)

DATE TYPE F: FORCED S:SCHEDULED DURATION (HOURS)

REASON" >

METHOD OF SHUTTING DOWN<'>

CAUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit operated at full power for the entire month of September.

Average power for the month was 99.7%.

(1) Reason A-Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1-Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5-Other (Explain)

0, I

I A

li jf lg Z

I