DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas
& Electric Corp.
WIDAY,J.A.
Rochester Gas a Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Mo rating rept for Mar 1996 for Gina Station.
/960405 1
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2;109(9/19/72).
'05000244 E
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL LITCO BRYCE iJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME JOHNSON,A LE C TER
.0 RGNl NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
N NOTE TO ALL "R1DS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKI ROOM OWPN SD-S(EXT, 415"2083)
TO ELIMINATE YOUR NAME PROM DISTRIBUTION LISTS POR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
76RK
/
HATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELt'PHONC ARcA cooc 710 546.2700 GINNA STATION April 5, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for March, 1996 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1996.
Very truly yours, s
h A. Wida lant Manager li.00"8 JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
Vwoea<0077 960SSX PDR ADQCK 05000244',
R PDR
OPERATING DATAREPORT COMPLETED BY:
ri 5 1996 50-244 John V. Walden TELEPHO (716) 771 3588 Notes
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
March 1996 3.
Licensed Thermal Power (MWI):
1520 4.
Nameplate Rating (Gross MWe):
517 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependabte Capacity (Gross MWe):
490 7.
Maximum Dependabte Capacity (Net MWe):
470 8.
It Changes Occur in Capadty Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, IfAny (Net MWe:
- 10. Reason For Restrtctions, IfAn.
This Month Yr.-to.Date Cumulative-
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critica
- 13. Reactor Reserve Shutdovm Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. UnitAvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 662.5 0.0 659.8 0.0 947615.0 322337.0 306413.0 88.7 88.7 87.6 87.6 11.3 2184.0 2102.5 0.0 2099.8 0.0 3068799.0 1044176.0 992756.0 96.1 96.1 96.7 96.7 3.9 230952.0 185769.6 1687.6
'82848.5 8.5 259932107.0 86106676.0 81740568.0 79.2 79.2 76.4 76.4 5.5
- 24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance Start 4/01/96 Duration 58 da
- 25. ItShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units in Test Status (Prior to Commercial OperaVon):
Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY1, 1975
- CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969
G.
~
~
'VERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE:
ril 5 1996 COMPLETED BY:
John Walden TELEPHONE:
7 6
771-3588 MONTH March 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 477 17.
473 477 18.
474 3.
477 19.
473 4
~
476 20.
474 5.
477 21.
473 6
~
476 22.
7.
362 23.
24'75 25.
10.
26.
475 12.
13.
100 426 472 27.
28.
29.
476 475 475 14
~
15.
473 473 30.
31.
476 473 16.
473 INSTRUCTIONS On this format, list the average daily unit power.level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
DOCKI:.T NO.
UNll NAhfl: R E. CilNNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS I)A Il'-
CohfPLI'.1 I'.D BY ohn V. Walden REPORT hfONTH +arch ql:LIIPIIO
. (716) 771-3588 r
Ho.
Date 0 0 O~
Pl C0 00 Pl 0
c 000 0 4rl C
0 Ct Licensee Event Report II Ew 0
0 0
Vl Q C0 ul 0C Q
D E
0 O
Cause L Corrective Action to Prevent Recurrence 3-7-96 84.2 96-002 KE "B" Condenser Circulating Water ump tripoed causing a
Secondary system transient.
The Reactor was manually scramed due to Turbine Operatin Limits being exceeded.
See LER 96-002 for more details.
l F: Forced S:
Scheduled Rtv. 4/85 4949 2
Reason:
A-Equipment Failure (Explain)
I3-hfaintenancc or Test C-Refueling D-Regulatory Restriction E-Operator Training Bc Liccnsc Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) 3 hfcthod:
I-hfanual 2-hfanual Scram.
3-Automatic Scram.
4-Other {Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Liccnscc Event Rcport (LER) File (NUREG-0161)
Exhibit I - Same Source
NARRATIVE
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Qinna Nuclear Power Plant DATE: A 'l 5 19 COMPLETED BY:
John Walden TELEPHONE:
716 1-3588 MONTH March 1996 A forced outage occurred on March 7, 1996 due to the trip of the "B" Condenser Circulating Water Pump.
A manual reactor scram was initiated to prevent potential damage to the main turbine (see LER 96-002).
The unit was placed on-line on March 11, 1996 and ran at full power for the remainder of the month.
The average power for the month excluding the forced outage was 96%