Text
CATEGORY j.
REGULATOR NFORMATION DISTRIBUT'ION 5
. TEM (RIDS).-
I FAC1'f:~50-"244 Robert-Emmet-Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.
Rochester Gas
&-Electric Corp.
WIDAY,J.A.
Rochester, Gas
& Electric Corp.
RECI'P!NAME, RECIPIENT AFFILIATION
(
SUBJECT:
Monthly operatin t for Dec 1995 for RE Ginna Nuclear Power Plant.
60108 r.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 E
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1'
'JOHNSON,A RGN1 4
COPIES LTTR ENCL 1,
1 1
'1 1
1 EXTERNAL': LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 D
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE)
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO.'ELIMINATE YOUR NAME FROM DISTRIBUTION. LISTS FOR DOCUMENTS,YOU DON'T'NEED[
F
'OTAL NUMBER OF COPIES REQUIRED:. LTTR 9
,ENCL 9-
t iiiiiiiiiIII Iiiiiiiiiiii
'.z~i7jjpi iiiiiIiiiI'itZAFZ iiiiiiIiiii RQV Lul EH[ ~
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE Tla 546 2700 GINNA STATION January 8,
1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Dear Sir:
Monthly Report for'ecember, 1995 Operating Status In'formation R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of December, 1995.
Very truly yours, ph A. Wi lant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1) 960i250234 95i23i PDR ADQCK 05000244 PDR
OPERATING DATAREPORT I-244 Janua 8 1996 COMPLETED BY:
John V. Walden TELEPHONE P16) 7714588 Notes
- 1. Unit Name:
RE. GINNANUCLEARPOWER PLANT
- 2. Reporting Poriod:
December 1995
- 3. Ucensed Thormal Power (MWI):
1520 4.
Nameplate Rating (Gross MWo):
490
- 5. Design Electric Rating (Not MWe):
470 6.
Maximum Oopendablo Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWo):
470 8.
IfChanges Occur in Capacity Rating (Items Numbor 3 Through 7) Sinco Last Report, Givo Reason:
9.
Powor Lovol to Which Rostrictod, IfAny (Net MWo):
- 10. Reason For Restrictions, IfAn:
This Month Yr:to-Date Cumulalive-
- 11. Hours in Roportod Period
- 12. Number of hours Reactor Was Critical
- 13. Roactor Reserve Shutdown Hours
- 14. Hours Genorator On-line
- 15. UnitReserve Shutdown Hours
- 16. Gross Thormal Energy Genoratod (MWH)
- 17. Gross Electrical Enorgy Genoratod (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. UnitAvailabilityFactor (%)
- 21. UnitCapacity Factor (using MDC Net) (%)
- 22. UnitCapacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
744.0 744.0 0.0 744.0 0.0 1095856.0 373167.0 354889.0 100.0 100.0 101.5 101.5 0.0 8760.0 7851.3 0.0 7776.4 0.0 11348071.0 3828448.0 3638582.0 0.6 228768.0 183667.1 1687.6
'80748.7 8.5
'56863308.0 85062500.0 80747812.0 79.0 79.0 762 762 5.5
- 24. Shutdowns Schodulod Over Next 6 Months (Typo, Date and Duration of Each):
Rofuolin and Maintenance Start 4/01/96 Duration 60 da
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units ln Tost Status (Prior to Commercial Operagon):
Force st Achiovod INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION CUMULATIVETOTALCOMMENCINGJANUARY1, 1975 "CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969
t e
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: JanQar 8
1996 COMPLETED BY:
John Walden TELEPHONE:
6 771-3588 MONTH December 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 477 17.
477 2.
477 18.
476 3.
477 19.
477 476 20.
476 477 21.
476 6
~
477 22.
476 7.
476 23.
476 8.
476 24.
477 9.
476 25.
477 10.
476 26.
476 476 27.
476 12.
476 28.
477 13.
476 29 476 14.
476 30.
477 15.
477 31.
477 16.
476 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
DOCKET NO.
~O-244 UNI1 NAMI.. R.E. GINNA NUCLEAR PO+EQ.PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE COhIPLI'.1 I'.D BY,,'fohn V. Maiden 199,)
1'I.LI'.PIIO 716 771-No.
Date 0
III 0
~
0 O~
C0Vl
-0 O
- 0) o-0 0 c u
~oeo own 0 0Q Licensee Event Report ff Em 0
0 III lg0 IA C0 lr) 0C 0
t)
E 0
lJ Cause g) Corrective Action to Prevent Recurrence F: Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hlethod:
I-hlanual 2-hfanual Scram.
3-Automatic Scratn.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NURFG-OI (I])
Exhibit I - Same Source
l v
NMGGLTIVE
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: J ua 8
996 COMPLETED BY:
John Walden TELEPHONE:
716 771-3588 MONTH December 1995 Average power for the month was 97'%
1
~ 0