Monthly Operating Rept for May 1996 for Re Ginna Nuclear Power Plant
ML17264A534
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1996
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9606140389
Download: ML17264A534 (12)


Text

CATEGORY 1 REGULATO INFORMATION DISTRIBUTION YSTEM (RIDS)

ACCESSION NBR:9606140389 DOC.DATE: 96/05/31 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION WALDENgJ.V.

Rochester Gas 6 Electric Corp.

WIDAY,J.A.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000244

SUBJECT:

Monthly operating rept for May 1996 for RE Ginna Nuclear Power Plant.W/960611 ltr.

DZSTRiBUTZON CODE:

iE24D COPIES RECEIVED:LTR I

ENCL i

SIZE:

TITLE: Monthly Operating Report

('per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E G

RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID,CODE/NAME VISSINGTG.

FILE CENTER 1

R NOAC COPIES LTTR ENCL 1

1 1

1 1

1' 1

0 R

D 0

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS D'OR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

D

~

I

t.>>zznruziyg~ztzuizn AHP i

zuggr(i/iiuzII

~ lzzAN'zzzizI ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TKl.KPHONC AREA COOK 7ld 546-2700 GINNA STATION June 11, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1996 Operating Status Information R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1996.

Very truly yours, Joseph A. Widay Plant Manager JAW:tjn Attachments c:

Mr. Thomas T. Martin NRC (1) 9bObl40389 9b053l PDR ADQCK - 05000244<,,i p R

PDR '.

r l

k

OPERATING DATAREPORT COMPLETED BY:

June 11 1996 50-244 John V. Waiden TELEPHONE (716) 7714588 Notes

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

June 1996 3.

Licensed Thermal Power (MWt):

1520 4.

Nameplate Rating (Gross MWe):

517 5.

Design Electric Rating (Net MWe):

470 6.

Maximum Dependable Capacity (Gross MWe):

490 7.

Maximum Dependable Capacity (Net MWe):

470 8.

IfChanges Occur in Capacity Rating (Items Number 3 Through?) Since Last Report, Give Reason:

9.

Power Level to Which Restricted, IfAny (Net MWe:

10. Reason For Restrictions, IfAn.

This Month Yr.-to-Date Cumulative"

11. Hours In Reported Period
12. Number of hours Reactor Was Critical
13. Reactor Reserve Shutdovm Hours
14. Hours Generator On-line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor (%)
20. Unit AvailabilityFactor (%)
21. Unit Capacity Factor (using MDC Net) (%)
22. Unit Capacity Factor (using DER Net) (%)
23. Unit Forced Outage Rate (%)

744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ERR 364?.0 2109.3 0.0 2106.1

"'.0 3072934.0 1045592.0 994041.0 57.7 57.7 58.0 58.0 3.8 232415.0 185776.4 1687.6

  • 182854.8 8.5

'59936242.0 86108092.0 81741853.0 78.7 78.7 75.9 75.9 5.5

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Start 4/01/96 Scheduled Duration 69 da

25. IfShutdovm At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTALCOMMENCINGJANUARY1, 1975 "CUMULATIVETOTALCOMMENCINGNOVEMBER 8, 1969

1l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE:

June 11 1996 COMPLETED BY:

TELEPHONE:

John Walden 716 771-3588 MONTH Ma 1996 DAY AVERAGE DAIL'Y POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.

2.

18.

3.

19.

4.

20.

21.

6.

22.

7.

23.

24.

9.

25.

10.

26.

27.

12.

28.

13.

29.

14.

30.

15.

31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.

Compute to the nearest whole megawatt.

DOCKET NO.

VNITNAhll:R E GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhtPLI:Tl.:D BY on a

en q I:Li:PllON (716) 771-3588 No.

Date

.0 l4 0P 0

O ~

C0

. 0'0 nc L

ul ~0 c 0 Cl

> rx,'

lA C X

0O Licensee Event Report II Em 0

lA C

Cl ln C

0 0

Q 00 LJ Cause g Corrective Action to Prevent Recurrence 4/1/96 S

744.0 C

1 Scheduled shut down Sor refueling and maintenance.

1 F:

Forced S:

Scheduled Rtv. 4/85 4949 2

Reason:

A-Equipment Failure (Explain)

B-hfaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlethod:

l-hlanual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsce Event Rcport (LER) F ile (NVREG-oi63)

Exhibit l - Same Source

P>

~ ~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:

June 11 1996 COMPLETED BY:

Joh Walden TELEPHONE:

716 771-3588 MONTH Ma 1996 The unit was shutdown on April 1, 1996 for refueling and Steam Generator Replacement.

The core was loaded from the spent fuel pool into the reactor once Containment liner closure was completed.

Steam Generator reattachment to piping systems has been completed.

The Containment structure was pressurized for an integrity test.

The test was a success and a normal plant start up is expected in June of 1996.