CATEGORY 1 REGULATO INFORMATION DISTRIBUTION YSTEM (RIDS)

ACCESSION NBR:9606140389 DOC.DATE: 96/05/31 NOTARIZED: NO DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDENgJ.V. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1996 for RE Ginna Nuclear Power Plant.W/960611 ltr.

DZSTRiBUTZON CODE: iE24D COPIES RECEIVED:LTR I ENCL i SIZE:

TITLE: Monthly Operating Report ('per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 E G

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID,CODE/NAME LTTR ENCL 0 PD1-1 PD 1 1 VISSINGTG. 1 1 R

INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 1 NRR/DRPM/PECB 1 1 R 1 1' EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 NRC PDR 1 1 D

0 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS D'OR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

D ~

I

t .>>zznruziyg~ztzuizn AHP i

zuggr(i/iiuzII

~

lzzAN'zzzizI ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TKl.KPHONC AREA COOK 7ld 546-2700 GINNA STATION June 11, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1996 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1996.

Very truly yours, Joseph A. Widay Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1) 9bObl40389 9b053l PDR ADQCK -

05000244<,,i p R PDR '.

r l k

OPERATING DATA REPORT 50-244 June 11 1996 COMPLETED BY:

John V. Waiden TELEPHONE (716) 7714588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: June 1996
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through?) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An .

This Month Yr.-to-Date Cumulative"

11. Hours In Reported Period 744.0 364?.0 232415.0
12. Number of hours Reactor Was Critical 0.0 2109.3 185776.4
13. Reactor Reserve Shutdovm Hours 0.0 0.0 1687.6 *
14. Hours Generator On-line 0.0 2106.1 182854.8
15. Unit Reserve Shutdown Hours 0.0 "'.0 8.5
16. Gross Thermal Energy Generated (MWH) 0.0 3072934.0 '59936242.0
17. Gross Electrical Energy Generated (MWH) 0.0 1045592.0 86108092.0
18. Net Electrical Energy Generated (MWH) 0.0 994041.0 81741853.0
19. Unit Service Factor (%) 0.0 57.7 78.7
20. Unit AvailabilityFactor (%) 0.0 57.7 78.7
21. Unit Capacity Factor (using MDC Net) (%) 0.0 58.0 75.9
22. Unit Capacity Factor (using DER Net) (%) 0.0 58.0 75.9
23. Unit Forced Outage Rate (%) ERR 3.8 5.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Start 4/01/96 Scheduled Duration 69 da

25. If Shutdovm At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 11 1996 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH Ma 1996 DAY AVERAGE DAIL'Y POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17.

2. 18.
3. 19.
4. 20.

21.

6. 22.
7. 23.

24.

9. 25.
10. 26.

27.

12. 28.
13. 29.
14. 30.
15. 31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO.

VNITNAhll: R E GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhtPLI:Tl.:D BY on . a en q I:Li:PllON (716) 771-3588 L

ul ~0 C c 0 Licensee Em Cl ln Cause g Corrective

.0 l4 C C 0 Cl Event 0 00 Action to No. Date 0 0 > Q 0

P '0

. 0 rx,'

Report 0 Prevent Recurrence O ~ nc X

lA C II lA LJ 0

O 4/1/96 S 744.0 C 1 Scheduled shut down Sor refueling and maintenance.

1 2 Reason: hlethod: Exhibit G - Instructions F: Forced for Preparation of Data S: Scheduled A-Equipment Failure (Explain) l-hlanual B-hfaintenance or Test 2-hlanual Scram. Entry Sheets for Liccnsce C-Refueling 3-Automatic Scram. Event Rcport (LER) F i le (N VR EG-D-Regulatory Restriction 4-Other (Explain) oi63)

E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) Exhibit l - Same Source Rtv. 4/85 4949

P> ~ ~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 11 1996 COMPLETED BY:

Joh Walden TELEPHONE: 716 771-3588 MONTH Ma 1996 The unit was shutdown on April 1, 1996 for refueling and Steam Generator Replacement. The core was loaded from the spent fuel pool into the reactor once Containment liner closure was completed. Steam Generator reattachment to piping systems has been completed. The Containment structure was pressurized for an integrity test. The test was a success and a normal plant start up is expected in June of 1996.

l ~

'I 4

e