Monthly Operating Rept for Mar 1997 for GNPP.W/970407 Ltr
ML17264A856
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1997
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9704160064
Download: ML17264A856 (7)


Text

CATEGORY j.

'L'EGULAT(

I INFORMATION DISTRIBUTION +TEM (RIDE)

A<CESS'ION, NBR:9704160064 DOC.DATE: 97/03/31 NOTARIZED: NO DOCKET FACIL:50- 44 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AU'EH.NQ AUTHOR AFFILIATION WALDEN,J. Rochester Gas 6 Electric Corp.

WIDAYFJ.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1997 for GNPP.W/970407 ltr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR i ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs) A NOTES:License Exp date in accordance with 10CFR2.,2.109(9/19/72). 05000244 E

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSINGFG. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CEN E 1 1 NRR/DRPH/PECB 1 1 PAD 1 1 R

RGNl 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

0 L

ZZ(VI g Znsiu 0 ~ LOCO I~ I

/ /III/~llllllllll uj7j 8K, ': r ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14849-000)

TKLKPHONK ARKA COOK T14 546.2700 April 7, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for March, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of March, 1997.

Very truly yours,

a. d se h A. Wid P ant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

'P7041b00b4 97033$ .

PDR ADOCK 05000244 R PDR

OPERATING DATA REPORT 50-244 ri 7 1997 COMPLETED BY:

John V. Walden TELEPHONE (716) 7714588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period; March 1997
3. Licensed Thermal Power (MWI): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 480
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, IfAny (Net MWe:
10. Reason For Restrictions, IfAn:

This Month Yr.-to-Date Cumulative"

11. Hours in Reported Period 744.0 2160.0 239712.0
12. Number of hours Reactor Was Critical 744.0 2160.0 192074.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 744.0 2160.0 '89086.5
15. Unit Reserve Shutdown Hours 0.0 0.0 85
16. Gross Thermal Energy Generated (MWH) 1126900.0 3274003.0 269150273.0
17. Gross Electrical Energy Generated (MWH) 385971.0 1121388.0 89231697.0
18. Net Electrical Energy Generated (MWH) 367702.0 1068407.0 84714273.8
19. Unit Service Factor (%) 100.0 100.0 78.9
20. Unit Availability Factor (%) 100.0 100.0 '78.9
21. Unit Capacity Factor (using MDC Net) (%) 103.0 103.0 76.2
22. Unit Capacity Factor (using DER Net) (%) 103,0 103.0 76.2
23. Unit Forced Outage Rate (%) 0.0 0.0 5.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A ril 7 1997 COMPLETED BY:

ohn Wa den TELEPHONE: 6 771-3588 MONTH March 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 496 17. 494

2. 497 18. 495 496 19. 495
4. 496 20. 494 497 21. 495
6. 496 22. 495
7. 496 23. 495
8. 496 495
9. 496 25. 494
10. 495 26. 494 495 27. 495
12. 495 28. 495
13. 494 29. 495 496 30. 496
15. 496 31. 467
16. 495 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO: 80-244 UNIT: R.E. GINNA NUCLEAR POWER PLANT ATE: A ril 7. 1997, COMPLETED BY:

John Walden UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH March 1997 No. Date Type Duration Reason'ethod of Code'omponent System Code'ause & Corrective Action to (hours) reactors'icensee shuting down Event Prevent Recurrence Report ¹ 1

F: Forced 2

Reason:

3 Method:

4 Exhibit G - Instructions

. ~

S: Scheduled A-Equipment (Explain) 1-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram. Entry Sheets for C-Refueling 3-Automatic Scram. Licensee Event Report D-Regulatory 4-Other (Explain) (LER) File (NUREG-E-Operator Training A 0161)

Lecensee Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 5 Exhibit 1- Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Qinna Nuclear Power Plant DATE: A ril 7 1997 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH March 1997 The unit operated at full power for the entire month of March. The average power level was 99.7%