Monthly Operating Rept for Mar 1999 for Ginna Station.With 990409 Ltr
ML17265A624
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1999
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9904200295
Download: ML17265A624 (6)


Text

CATEGORY 1 REGULA'2. RY INFORMATION DISTRIBUTI . SYSTEM (RIDS)

ACCESSION NBR:9904200295 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME . AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas 5 Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Monthly operating rept for Mar 1999 for Ginna Station. With 990409 ltr. A DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: T TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 RECIPIENT COPIES RECIPIENT COPIES 0 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD1-1 PD 1 1 VISSING,G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 ILE CENTER 0 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 Ilail, i> iIIIIi)iI>t'I i ',Ii I I

', II i,<

WASTETH

'OTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

4

'1 t1 '

ANO II ROCHESTER GAS ANDELECTRIC CORPORATION 89EASTAVENIJE, ROCHESTER, N.Y. 14649-0001 AREA CODE 716-546-2700 April 9, 1999 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for March, 1999 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of March, 1999.

Very truly yours, ad o eph A. Wida Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 9904200295 990331 PDR ADGCK 05000244 R PDR

'! 00034

OPERATING DATA REPORT 50-244 A ril 9, 1999 COMPLETED BY:

John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT , Notes:
2. Reporting Period: March, 1999
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 9.2 1425.2 208144.3
6. Hours Generator On-line 8.9 1424.9 205123.6 85 *
7. Unit Reserve Shutdown Hours 0.0 0.0
8. Net Electrical Energy Generated (MWH) 2219.0 653306.0 92504386.4
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY: John V. Walden UNIT SHUTDOWN REPORTING PERIOD: March 1999 (Month/Year)

NO. DATE TYPE DURATION REASON"'ETHOD OF DOWN"'AUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED COMMENTS 1 3/1/99 735.1

SUMMARY

The unit was in shutdown for refueling and maintenance on March 1, 1999.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

0 1

t