ML17264A397

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for Re Ginna Nuclear Power Plant
ML17264A397
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/29/1996
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9603140099
Download: ML17264A397 (8)


Text

CATEGORY 1 REGULATOR INFORMATION DISTRIBUTIONOISTEM (RIDE)

I FACIL:-50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION WALDEN,J.U.

Rochester Gas a Electric Corp.--

WIDAY,J.A.

Rochester Gas !'lectric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244

SUBJECT:

Monthly opera for Feb 1996 for RE Ginna Nuclear Power Plan 960307 r.

DISTRIBUT;ON CODE:

IE24D COPIES RECEIVED:LTR 1

ENCL J SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E RECIPIENT ID CODE/NAME PD1-1 PD COPIES LTTR ENCL 1

1'ECIPIENT ID CODE/NAME JOHNSONFA COPIES LTTR ENCL 1

1 0

INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H

NRC PDR I

1 1

1 1

1 1

1 1

FIL NOAC R

1 1

1 1

1 1

1 D

NOTE TO ALL MRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

l'

t ffffffifif/

liiiffilf ffffI7ff~lineiiif f ffffffffl'ifffffff ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TELEPHONE AREA COOE 7IO 546.2700 GINNA STATION March 7, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Dear Sir:

Monthly Report for February, 1996 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1996.

Very truly yours, s

A. Widay an Manager JAW:tjn Attachments c:

Mr. Thomas T. Martin NRC (1)

M03l40099 960229 PI PDR ADOCK 05000244I R

PDRL

~

~4'Oo~~

OPERATING DATAREPORT COMPLETED BY:

a 71 50-244 TELEPHO John V. Walden (716) 7714588 Notes

1. Unit Name:

RE. GINNANUCLEARPOWER PLANT

2. Reporting Period:

Fobrua 1996 3.

Licensed Thermal Power (MWI):

1520 4.

Nameplate Rating (Gross MWo):

517 5.

Design Electric Rating (Net MWo):

470 6.

Maximum Dependable Capacity (Gross MWe):

490 7.

Maximum Dependable Capacity (Not MWo):

470 8.

IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:

RoviewofName lateRatin definitionrovealodthatthovaluois517MWeinsteadof490MWoas roviousl re Ited.

Name late Ratin

=

urbino Generator MVA x Power Factor 608.4 MVA x.85 P

-"517.14 MWo 9.

Power Level to Which Restricted, IfAny(Net MWo):

10. Reason For Restrictions, IfAn.

This Month Yr:to.Dato Cumulative"

11. Hours in Reported Porlod
12. Number of hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Gonoratod (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor (%)
20. UnitAvailabilityFactor (%)
21. UnitCapacity Factor (using MDC Not) (%)
22. Unit Capacity Factor (using DER Not) (%)
23. Unit Forced Outago Rate (%)

696.0 696.0 0.0 696.0 0.0 1024993.0 348735.0 331602.0 100.0 100.0 101.4 101.4 0.0 1440.0 1440.0 0.0 1440.0 0.0 2121184.0 721839.0 686343.0 100.0 if 100.0 101.4 101.4 0.0 230208.0 185107.1 1687.6 182188.7 8.5 258984492.0 85784339.0 81434155.0 79.1 79.1 76.3 5.5

24. Shutdowns Scheduled Ovor Next 6 Months (Typo, Date and Duration of Each):

Rofuelin and Maintenance Start 4/01/96 Duration 62 da

25. IfShutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTALCOMMENCINGJANUARY 1 ~ 1975 "CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE: March 7

1996 COMPLETED BY:

UakL John Walden TELEPHONE:

6 771-3588 MONTH Februar 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 476 17.

476 476 18.

476 3.

476 19.

476 476 20.

476 5.

475 21.

476 6.

476 22.

476 7.

476 23.

476 8.

476 24.

476 9.

476 25.

476 10.

476 26.

476 476 27.

476 12.

476 28.

476 13.

476 29.

476 14.

476 30.

15.

476 31.

16.

476 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.

Compute to the nearest whole megawatt.

no( Kl.T NO 50 244 IINITNAMI:R.E. GINNA NUCLEAR POWER. PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE

(:OhIPLI:.O'I:.D BY o n V. Wa1den Tl:.LI:PIIO 716 771-3588 REPORT hlONTH No.

Date 0

I-C0 IIIL 0 0 QX O~

Pl C0 VI00 OI o0 0 c 00 5 cc 0 N C

0O I.icensee Event Report tf Em 0

0 III 00 I/l C0 Irl C

0 E

0 Cause gI Corrective Action to Prevent Recurrence F: Forced S:

Scheduled IIEV. 4/WS 4'%eason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)

II-Other (Explain) hlethod:

I-hlanual 2-hlanual Scram.

3-Automa tie Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NIJRE(-

0161)

Exhibit I - Same Source

NARRATIVE

SUMMARY

OF OPERATING'XPERIENCE DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE:

M h 7 19 6

COMPLETED BY:

John Walden TELEPHONE:

716 771-3588 MONTH Februar 1996 Average power for the month was 97%

0

~4