Monthly Operating Rept for Dec 1997 for Re Ginna Nuclear Power Plant.W/980109 Ltr
ML17265A137
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1997
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9801210291
Download: ML17265A137 (11)


Text

CATEGORY 1 REGULNTO% INFORNATION DISTRIBUTIONYSTEN (RIDS>

ACCESSION NBR: 9801210291 DOC. DATE: 97/12/31 NOTARIZED: NO DOCKET I FAC IL: 50-p44 Robert Emmet Ginna Nuc lear P1 anti Uni t 1 i Rochester G 05000244 AUTH. NAME 'UTHOR AFFILIATION WALDENI J. V. Rochester Gas & Electric Corp.

N I DAYI J. A. Rochester Gas 5 Electric Corp.

RECIP. NAME RECIPIENT AFFILIATION VISSINGI G. S.

SUBJECT:

Monthly operating rept for Dec 1997 for RE Ginna Nuclear Poeer Plant. 8/980109 1tr.

DISTRIBUTION CODE: 1'E24D COPIES RECEIVED: LTR 'NCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES: License Exp date in accordance eith 10CFR2I 2. 109(9/19/72). 05000244 Q

RECIPIENT COPIES 'ECIPIENT COPIES 0 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSINGI G. 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENT 01 1 1 Y OC/DBA/PAD 1 1 1 EXTERNAL: LITCO BRYCEI J H 1 1 NOAC NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL

I>

E C

~/ t ////I//I/I/ jF/IIIIIEll/ LA\ ~ OPIA ~

lisizziiriz j~iigijxjjiti l

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKLKPHONK ARKA COOK 7IK 546-2700 January 9, 1998 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for December, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of December, 1997.

Very truly yours, a.d' e A. Widay P ant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

~801m PDR ADOCK

~ 9~~23<

05000244 PDR

~ '

OPERATING DATA REPORT 50-244 J ua 9 1998 COMPLETED BY:

John V. Walden TELEPHON (716) 771-3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: December 1997
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 480
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, IfAny (Net MWe):
10. Reason For Restrictions, lfAn:

This Month Yr.-to-Date Cumulative'*

11. Hours in Reported Period 744.0 8760.0 248312.0
12. Number of hours Reactor Was Critical 744.0 8044.9 197959.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On. line 744.0 8012.2 194938.7
15. Unit Reserve Shutdown Hours 0,0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 1128264.0 12005123.0 277881393.0
17. Gross Electrical Energy Generated (MWH) 387405.0 4090990.0 92201299.0
18. Net Electrical Energy Generated (MWH) 369591.0 3895649.6 87541516.4
19. Unit Service Factor (%) 100.0 91.5 79.1
20. Unit Availability Factor (%) 100.0 91.5 79.1
21. Unit Capacity Factor (using MDC Net) (%) 103.5 92.6 76.6
22. Unit Capacity Factor (using DER Net) (%) 105.7 94.6 76.6

,23. Unit Forced Outage Rate (%) 0.0 0.0 5.5

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMUlATIVETOTAL COMMENCING JANUARY 1, 1975

  • 'UMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

~ ~

~ ~

~

  • AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Januar 9 1998 COMPLETED BY:

John V. Walden TELEPHONE: 6 771-3588 MONTH December 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 497 17. 498

2. 497 18. 498
3. 497 19. 497 497 20. 498
5. 498 21. 499
6. 498 22. 498
7. 498 23. 498
8. 497 24. 498
9. 498 25. 499
10. 498 26. 499 498 27. 499
12. 498 28. 498 13.

14 15.

'98 497 498 29.

30.

31.

498 498 498

16. 498 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO: 50-&4 UNIT: R.E. GINNA NUCLEAR POWER PLANT ATE: Janua 9 1998 COMPLETED BY:

John V. Walden UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH December 1997 No. Date Type Duration Reason'ethod of Code'ause Code'omponent System & Corrective 'Action to (hours) reactors'icensee shuting down Event Prevent Recurrence Report ¹ 1 D-Regulatory 5 F: Forced E-Operator Training & Exhibit 1- Same Source S: Scheduled Lecensee Examination F-Administrative G-Operational Error (Explain) 4 H-Other (Explain) Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 3 Method:

1-Manual 2-Manual Scram.

3-Automatic Scram.

2 4-Other (Explain)

Reason:

A-Equipment (Explain)

B-Maintenance or Test C-Refueling

~

\

r>>

I I

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Januar 9 1998 COMPLETED BY:

John V. Walden TELEPHONE: 16 771-3588 MONTH December 1997 The unit operated at full power for the month of December. Average reactor power was 99.8%.

0 tt