Monthly Operating Rept for Apr 1996 for Re Ginna Nuclear Power Plant
ML17264A474
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1996
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9605140277
Download: ML17264A474 (8)


Text

CATEGORY 1 A

I REGULA'l~ Y INFORMATION DISTRIBUTIO SYSTEM (RIDS) 1$

DOCKET I

,FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas 6 Electric Corp.

WIDAY,J.A.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly oper for Apr 1996 for RE Ginna Nuclear Power Pl

.W 60507 r.

DISTRIBUTION CODE:

ZE24D COPIES RECEIVED:LTR I

ENCL I

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 'E RECIPIENT ID CODE/NAME PD1-1 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME VISSINGiG.

COPIES LTTR ENCL 1

1 INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

FILE CE 1

RGNl 1

NOAC 1

1 1

1 1

1 1

D 0

E N

NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl ll TOTAL NUMBER OF COPIES REQUIRED:

L'TTR'

'.ENCL '*9

V N

0 b

ROCHESTER GAS AND ELECTRIC

,c'ES zz'-)

CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE ala 546.2700 GINNA STATION May 7, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for April, 1996 Operating Status Information R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April 1996.

Very truly yours, a.. dM s

h A. Wid y Plant Manager JAW:tjn Attachments c:

Mr. Thomas T. Martin NRC (1) 9605140277 960430 PDR ADOCK 05000244 R

PDR

~grl I

f

I J,

II 4

OPERATING DATAREPORT COMPLETED BY Ma 7 1996 50-244 John V. Waiden TELEPHONE (716) 7714588 Notes

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

A ril 1996 3.

Licensed Thermal Power (MWt):

1520 4.

Nameplate Rating (Gross MWe):

517 5.

Design Electric Rating (Net MWe):

470 6.

Maximum Dependable Capacity (Gross MWe):

490 7.

Maximum Dependable Capacity (Net MWe):

470 8.

IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:

9.

Power Level to Which Restricted, IfAny (Net MWe:

10. Reason For Restrictlons, IfAn.

This Month Yr.-to-Date

, Cumulattve-

11. Hours in Reported Period
12. Number of hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor (%)
20. UnitAvailabilityFactor (%)
21. Unit Capacity Factor (using MDC Net) (%)
22. Unit Capacity Factor (using DER Net) (%)
23. Unit Forced Outage Rate (%)

719.0 6.8 0.0 6.3 0.0 4135.0 1416.0 1285.0 0.9 0.9 0.4 0.4 00 ceo 2903.0 2109.3 0.0 2106.1 0.0 3072934.0 1045592.0 994041.0 72.5 72.5 72.9 72.9 3.8 231671.0 185776.4 1687.6

'82854.8 85*

259936242.0 86108092.0 81741853.0 78.9 78.9 76.1 76.1 5.5

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Start 4/01/96 Scheduled Duration 62 da

25. IfShutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTALCOMMENCINGJANUARY 1, 1975

'*CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969

"'NITIN REFUELING SHUTDOWN

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE:

Ma 7

1996 COMPLETED BY:

ohn Walden TELEPHONE:

16 771-3588 MONTH A ril 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 50 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.

2.

18.

3.

20.

5.

21.

6.

22.

7.

23.

24.

25.

10.

26.

27.

12.

28.

13.

29.

14.

30.

15.

31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH DO(PKFT NO.

50 244 IINITNAMI:.R.E. GINNA NUCLEAR POWER PlANT UIIIT IUUTOOWII RIIO PIIWER REUUOTIOIII

(:OhlPLI'. I'I'.D IIYOoTn V. IIalden

'I I:I I:PIIQNI:( 7 16 )

77 1-3588 No.

Date C0 I

0P 0

O~

rUt C0el04 CC 0

ocu 4

w, > cx!

4 I/l C 0O Licensee Event Report 0

Ew 4

0 Ie 0

'Pa 0 IA C4 Ir$

C00 170 CJ Cause gI Corrective Action to Prevent Recurrence 4 /1/96 S

712.7 C

Scheduled shut down for refueling and maintenance.

I Fc Forced S:

Scheduled Rcv. 44$

ISA%

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlcchod:

1-hfanual 2-hfanual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Liccnscc Event Rcport (LER) File (NURF(-

ol6I)

Exhibic I - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE:

Ma 7

1996 COMPLETED BY:

Joh Walden TELEPHONE:

716 771-3588 MONTH A ril 1996 The unit was shutdown on April 1, 1996 for refueling and Steam Generator Replacement.

A full core off load to the spent fuel pool was performed during the first week of the outage.

The containment dome was opened to allow access to the Steam Generators.

The old Steam Generators were removed intact following cutting of Reactor Coolant System, Main Steam, and Feedwater piping.

New Steam Generators have been lowered into position and reattachment to piping systems is in progress.

Closure of containment is also in progress.