PRXORXTY 1 (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 P AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly Power operat'or Plant. / 0908 r.

Aug 1995 for RE Ginna Nuclear 0

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL I SIZE:

TITLE: Monthly Operating Report (per Tech Specs) 5 I

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 I RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 LE CENTER 1 1 NRR/DIS P/PI PB 1 1 /TR?M7KECB 1 1 RGNl 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

C

'4 LaaR Owl ~ ~

ANP TORK

>>'izgpx ~~lirzzzizn I gzii(N Illlzszzizz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649.0001 TELEPHONE AREA CODE 7I6 546.2700 GINNA STATION September 8, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for August, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1995.

Very truly yours,

a. d.

s h A. Wi y ant Manage ZAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

OPERATING DATA 50-244 REPO%'OMPLETED Se tember8 1995 BY John V. Walden TELEPHONE (716) 771D588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period: Au ust 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470 P
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative-

11. Hours in Reported Period 744.0 5831.0 225839.0
12. Number of hours Reactor Was Critical 711.9 4922.3 180738.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6 *
14. Hours Generator On. line 698.1 4847.4 177819.7
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 975763.0 7045017.0 252560254.0
17. Gross Electrical Energy Generated (MWH) 322720.0 2369036.0 83603088.0
18. Net Electrical Energy Generated (MWH) 305909.0 2250612.0 79359842.0
19. Unit Service Factor (%) 93.8 83.1 78.7
20. Unit AvailabilityFactor (%) 93.8 83.1 78.7
21. Unit Capacity Factor (using MDC Net) (%) 87.5 82.1 75.8
22. Unit Capacity Factor (using DER Net) (%) 87.5 75.8
23. Unit Forced Outage Rate (%) 6.2 0.9 5.6
24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prfor to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

t AVERAGE DAILY UNIT POWER LEV1K DOCKET NO:'0-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Se tember 8 1995 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH Au ust 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 457 17. 458 2 ~ 456 18. 458 3 ~ 459 19. 465 4 ~ 458 20. 468 5.

6.

7 ~

458 463 476 21 22 23.

'57

~ 461 459

8. 475 24. 459
9. 476 25. 103
10. 476 26. 17 475 27. 173
12. 467 28. 146
13. 462 29. 231
14. 460 30. 464
15. 461 31 ~ 470
16. 459 INSTRUCTIONS On this format, list MWe-Net for each day the average daily unit power level in in reporting month. Compute to the nearest whole megawat;t:.

DOCKET NO. 50-244 VNITNAhtl R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COhIPLETI:D I3Y on . a en TI:.LIIPHONIt 716 771-3588 h

cn ~0 c lA e c c v Licensee Ew Cl c Cause & Correct>ve L 0 c 0 Event 0 0 u Action to No. Date o P 0 > cc Ih Q Q 0 0 Q

oK~ O own c Report 0 0 lA (J E Prevent Recurrence EJ 0

0 95-07 8/25/95 F827A 95-008 Trip of "B" Circulating Water Pump 95-08 8/28/95 F 33.4 A Replacement of leaking drain line on the 2B Moisture Sepaxatox Reheater

  • To be Determined 1

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-hlanual for Preparation of Data B-hlaintenance or Test 2-hianual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (N VRE G-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8t License Examination F-Adminisuative G-Operational Error (Explain)

REV. 4/8$ 4949 H-Other (Explain) Exhibit 1 - Same Source

P NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: tember 8 1995 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH Au ust 1995 On August 25, the "B" Circulating Water Pump tripped due to a bolt failure which affected the pump's motor electrical control circuitry. Power was rapidly reduced manually; however, a pressure imbalance in the Main Condenser caused a secondary plant transient. The reactor was manually scrammed two mintues after the Circulating Water Pump trip. On August 26, the unit was placed on line, but power was limited to less than 504 while waiting for Circulating Pump Motor parts.

On August 28, power was reduced and the unit manually brought off line to repair an unisolable drain line off of the 2B Moisture Separator Reheater. The reactor remained critical while the section of leaking pipe was replaced. On August 29, the unit was placed on line and reached full power on August 30th.

Average power for the month excluding the above power reductions was 964.