Monthly Operating Rept for Apr 1999 for Re Ginna Nuclear Power Plant.With
ML17265A639
Person / Time
Site: Ginna 
Issue date: 04/30/1999
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9905170169
Download: ML17265A639 (7)


Text

REGULARLY ZMFORMATZOM DZSTRZBUTZIOSYSTEM (RZDS)

ACCESSION NBR:9905170169 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas E Electric Corp.

WIDAY,J.A'ochester Gas

& Electric Corp.

RECIP. NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Monthly operating rept for Apr 1999 for RE Ginna Nuclear Power Plant. With 990510 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 05000244 E

RECIPIENT ID CODE/NAME LPD1-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME VISSING,G.

FILE CE RGN1 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 Y

D

'E NOTE TO ALL MRIDSM RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

r

ANO tK~%

ROCHESTER GAS ANDELECTRIC CORPORATION 89 EAST AVENVE, ROCHESTER, N.Y. 14649-0001 AREA CODE 716-546-2700 May 10, 1999 US Nuclear Regulatory Commission Document Control Desk Atth:

Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for April, 1999 Operating Status Information R.E. Ginna Nuclear Power Plant Docket'No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1999.

xc:

U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 1482I Project Directorate 1-1 Washington, D.C. 20555 Very truly yours,

k. U' ep A. Widay Plant Manager U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 70~~9

@oooo'++

gq cpg0430 PDR ADOCK 0 R

h P

t e

OPERATING DATAREPORT COMPLETED BY:

50-244 Ma 10,1999 John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

A ril, 1999 3.

Design Electric Rating (Net MWe):

470 4.

Maximum Dependable Capacity (Net MWe):

Notes:

This Month Yr.-to-Date Cumulative**

5. Number of hours Reactor Was Critical
6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electrical Energy Generated (MWH) 188.6 139.3 0.0 36678.0 1613.8 1564.2 0.0 689984.0 208333.0 205262.9 8.5 92541064.4
    • CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969

F

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: Ma 10 1999 COMPLETED BY:

John V. WaIden UNIT SHUTDOWN REPORTING PERIOD:

A ril 1999 (Month/Year)

NO.

DATE 3/1/99 TYPE F: FORCED S: SCHEDULED DURATION (HOURS) 523.6 REASON"'ETHOD OF SHUTTING DOWN~

CAUSE/CORRECTIVE ACTIONS COMMENTS 4/23/99 4/27/99 13.8 42.8 A

LER 1999-006 LER 1999-007

SUMMARY

The unit was placed on line on April22, 1999 following refueling and maintenance.

A reactor trip occurred when Instrument 8t Control Technicians removed fuses from the wrong power range nuclear instrument channel while another was defeated.

The unit was placed on line on April23, 1999. A second reactor trip occurred on April27, 1999 when a reactor protection system bistable failed while another channel was defeated for calibration.

The unit was placed on line on April 29, 1999 and power was slowly increased for fuel conditioning for the remainder of the month.

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation S - Other (Explain)

r

'U

~

~

t