Monthly Operating Rept for Mar 1998 for Re Ginna Nuclear Power Plant.W/980407 Ltr
ML17265A229
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1998
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9804160331
Download: ML17265A229 (8)


Text

CATEGORY REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9804160331 DOC.DATE: 98/03/31 NOTARIZED: NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION V1SSING,G.S.

SUBJECT:

Monthly operating rept for Mar 1998 .for RE Ginna Nuclear Power Plant:W/980407 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 Q

RECXPIENT COPIES RECIPIENT COPIES 0 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSING,G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 Kr ER 1 1 OC/DBA/PAD 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 1 NRC PDR 1 1 D

0 I C

Ul M

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

r h

l II

ANn ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89EASTAVENUE, ROCHESTER, N.Y. Id6d9.000I AREA CODE 716 5'.2700 April 7, 1998 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for March, 1998 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of March, 1998.

Very truly yours, Joseph A. Widay Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

'P804i6033i 'P8033i PDR ADOCK 05000244 R PDR

/' ~

OPERATING DATA REPORT 50-244 April 7, 1998 COMPLETED BY:

hn V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: March, 1998
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 744.0 2160.0 200119.2
6. Hours Generator On-line 744.0 2160.0 197098.7
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 369550.0 1072383.0 88613899.4
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

4 4 *A

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY: John V. Walden UNIT SHUTDOWN REPORTING PERIOD: March 1998 (Month/Year)

NO. DATE TYPE DURATION REASON"'ETHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN" >

COMMENTS

SUMMARY

The unit operated at full power for the entire month of March.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H- Other (Explain)

0, ~ ~ 'h