COMPLETED BY:
50-244 October 5 1995 John V. Walden TELEPHO E
(716) 771-3588 Notes
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
Se tember 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWe):
470 8.
IfChanges Occur In Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, IfAny (Net MWe:
- 10. Reason For Restrictions, IfAn:
This Month Yr.-to.Date Cumulative'"
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
720.0 720.0 0.0 720.0 0.0 1055684.0 354255.0 3367(6.0 100.0 100.0 99.5 0.0 6551.0 5642.3 0.0 5567.4 0.0 8100701.0 2723291.0 2587375.0 85.0 85.0 84.0 84.0 0.8 226559.0 181458.1 1687.6
'78539.7 8.5
- 253615938.0 83957343.0 79696605.0 78.8 78.8 75.9 75.9 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 28. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY 1 ~ 1975