PRIORITY t
(ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas
& Electric Corp.
WIDAY,J-A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET g
05000244 P
SUBJECT:
Monthly operati e t for Sept 1995 for RE Ginna Nuclear Power Plant.
PFl003 l DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME JOHNSON,A
~ILE CENTER 01 NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
N NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D8 (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
t f BCW t// ÃiT lan(O Isa ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLCPHONC ARC* COOC TIO 546-2700 GINNA STATION October 3,
1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Dear Sir:
Monthly Report for September, 1995 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1995.
Very truly yours, u.d s
h A. Wida lant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1) 9510110036 950930 T'DR ADOCK 05000244 R
50-244 October 3 1995 r
John V. Walden TELEPHONE (716) 7714588 COMPLETED BY OPERATING DATAREPORT
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
Se tember 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Net MWe):
470 8.
IfChanges Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, IfAny (Net MWe:
- 10. Reason For Restrictions, IfAn:
This Month Yr.-to-Date Cumulative'*
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
720.0 720.0 0.0 720.0 0.0 1055779.0 354255.0 336763.0 100.0 100.0 0.0 6551.0 5642.3 0.0 5567.4 0.0 8100796.0 2723291.0 2587375.0 85.0 85.0 84.0 84.0 0.8 226559.0 181458.1 1687.6
'78539.7 8.5
'53616033.0 83957343.0 79696605.0 78.8 78.8 75.9 75.9 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. IfShutdown At End of Report Period, Estimate Date of Startup:
- 26. Units in Test Status (Prior to Commerdal Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY1, 1975
" CUMULATIVETOTALCOMMENCING NOVEMBER8, 1969
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: October 3
1995 COMPLETED BY:
l, 3
John Walden MONTH
.Se tember 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
TELEPHONE:
716 771-3588 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 464 17.
468 2 ~
463 18.
468 3 ~
463 19.
468 4 ~
464 20.
468 5.
463 21.
469 6.
464 22.
469 7 ~
465 23'70 8.
467 24.
471 9.
468 25.
470 10'68 26.
470 467 27.
470 12.
468 28.
470 13.
467 29.
470 14 ~
467 30.
470 15.
468 31 ~
,16.
467 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
DOCKET NO.
50-244 UNITNAMI:R E. PINNA NUCLEAR POWER PLANT' UNIT SHUTDOWN AND POWER REDUCTIONS DATE COMPLI Tl:D BY on a
en No.
Date D0 D
~
0 DX O ~
c0 D0 n.'
0 E v 0
0 e D
0 CL Licensee Event Report e
Ew 0
0 0
v) U CDen D00 D0 CJ Cause 8 Corrective Action to Prevent Recurrence F: Forced S:
Scheduled REV. 4/SS 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE SUMHQQtY OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: October 3
1995 COMPLETED BY:
John Walden TELEPHONE:
716 1-3588 MONTH Se tember 1995 Average power for the month was 96~.