Monthly Operating Rept for Sept 1995 for Re Ginna Nuclear Power Plant.W/951003 Ltr
ML17264A183
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9510110036
Download: ML17264A183 (6)


Text

t PRIORITY (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET g FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 P AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.

WIDAY,J-A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operati Power Plant. PFl003 e tl for Sept 1995 for RE Ginna Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB 1 1 1

~ILE CENTER 01 NRR/DRPM/PECB 1

1 1

1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

f BCW t//

ÃiT t lan(O Isa ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLCPHONC ARC* COOC TIO 546-2700 GINNA STATION October 3, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for September, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1995.

Very truly yours, u.d s h A. Wida lant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1) 9510110036 950930 ADOCK 05000244 T'DR R PDR

OPERATING DATA REPORT 50-244 COMPLETED BY r October 3 1995 John V. Walden TELEPHONE (716) 7714588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period: Se tember 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative'*

11. Hours in Reported Period 720.0 6551.0 226559.0
12. Number of hours Reactor Was Critical 720.0 5642.3 181458.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 720.0 5567.4 '78539.7
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 1055779.0 8100796.0 '53616033.0
17. Gross Electrical Energy Generated (MWH) 354255.0 2723291.0 83957343.0
18. Net Electrical Energy Generated (MWH) 336763.0 2587375.0 79696605.0
19. Unit Service Factor (%) 100.0 85.0 78.8
20. Unit AvailabilityFactor (%) 100.0 85.0 78.8
21. Unit Capacity Factor (using MDC Net) (%) 84.0 75.9
22. Unit Capacity Factor (using DER Net) (%) 84.0 75.9
23. Unit Forced Outage Rate (%) 0.0 0.8 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commerdal Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: October 3 1995 COMPLETED BY: l, 3 John Walden TELEPHONE: 716 771-3588 MONTH .Se tember 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 464 17. 468 2 ~ 463 18. 468 3 ~ 463 19. 468 4 ~ 464 20. 468

5. 463 21. 469 6.

7 8.

~

464 465 467 22.

23 24.

'70 469 471 9.

10 '68 468 467 25.

26.

27.

470 470 470

12. 468 28. 470
13. 467 29. 470 14 ~ 467 30. 470
15. 468 31 ~

,16. 467 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO. 50-244 UNITNAMI:R E. PINNA NUCLEAR POWER PLANT' UNIT SHUTDOWN AND POWER REDUCTIONS DATE COMPLI Tl:D BY on . a en 0 C D

0 c E v Licensee Ew Den D

Cause 8 Corrective 0 0 Event 0 0 0 D Action to No. Date D 0 0

~ 0 D DX O ~ 0 n.' 0 e D Report e v) U 0 Prevent Recurrence CJ 0

CL 3

F: Forced Reason: Method: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)

REV. 4/SS 4949 H-Other (Explain) Exhibit 1 - Same Source

NARRATIVE SUMHQQtY OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: October 3 1995 COMPLETED BY:

John Walden TELEPHONE: 716 1-3588 MONTH Se tember 1995 Average power for the month was 96~.