CATEGORY 1 REGULA'~~ Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NBR:9812160081 DOC.DATE: 98/11/30 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear. Plant, Unit 1, Rochester G
AUTH.NAME
~
AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas
&, Electric Corp.
WIDAY,J.A.
Rochester Gas
- k. Electric Corp.
RECIP.NAME RECIPIENT AFFILXATION DOCKET ¹ 05000244 VISSING,G.S.
~
SUBJECT:
Monthly operating rept for Nov 1998 for RE Ginna Nuclear Power Plant. With 981210 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR l ENCL
~
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
E 05000244 RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME VXSSING,G.
E CENTER 0
NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 Y
D E
"N NOTE TO ALL ERIDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE'THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
ANO ROCHESTER GAS AND ELECTRIC CORPORATION 89 EASTAVENUE, ROCHESTER, N.Y. 14649-0001 AREA CODE 716-546-2700 December 10, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:
Guy S. Vissing Project Directorate l-1 Washington, DC 20555
Subject:
Monthly Report for November, 1998 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Vissing:
" Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November, 1998.
Very truly yours, a.d.
se A. Widay P ant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I
475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 98i2ih008i 98ii30 PDR ADQCK 05000244 R
OPERATING DATAREPORT COMPLETED BY:
50-244 December 10, 1998 John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
November, 1998 3.
Design Electric Rating (Net MWe):
470 4.
Maximum Dependable Capacity (Net MWe):
Notes:
This Month Yr.-to-Date Cumulative**
- 5. Number of hours Reactor Was Critical
- 6. Hours Generator On-line
- 7. Unit Reserve Shutdown Hours
- 8. Net Electrical Energy Generated (MWH) 720.0 720.0 0.0 357259.0 8016.0 8016.0 0.0 3943574.0 205975.2 202954.7 8.5 91485090.4
- CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: December 10 1998 COMPLETED BY:
John V. Walden UNIT SHUTDOWN REPORTING PERIOD:
November 1998 (Month/Year)
NO.
DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)
REASON"'ETHOD OF SHUTTING DOWN"'AUSE/CORRECTIVE ACTIONS COMMENTS
SUMMARY
The unit operated at full power for the month of November (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Do
RG&E GINNASTATION OPERATING
SUMMARY
November, 1998 Page1 of 2 OPERATIONS RECORDS Category 3.4.8 Reviewed by ELECTRICAL GROSS GENERATION
¹11 TRANSFORMER
¹1 2A TRANSFORMER
¹12B TRANSFORMER MWH MWH MWH MWH
¹11 AND¹12 TRANSFORMER, ON L'INE MWH NET GENERATION ON LINE MWH MONTH 374975.0 16514.0 483.0 719.0 17716.0 357259.0 YEAR 4139122.0 181523.0 5101.0 8924.0 195548.0 3943574.0
'O DATE 96340421.0 4488180.0 291251.6 75899.0 4855330.6 91485090.4
¹11 TRANSFORMER, OFF LINE MWH 0.0 0.0 3958.0
¹12A TRANSFORMERS, OFF LINE MWH
¹12B TRANSFORMER, OFF LINE MWH AVERAGE GENERATION/HR GROSS MW TOTALSTATION SERVICE / GROSS GENERATION ON LINE HOURS OFF LINE HOURS TOTALHOURS UNIT RESERVE SHUTDOWN HOURS Cumlative Total Commencing January 1, 1975 0.0 0.0 520.8 0.0 720.0 0.0 720.0 0.0 0.0 0.0 516.4 0.0 8016.0 0.0 8016.0 0.0 266462.6 49141.8 474.7 0.1 202954.7 51373.3 254328.0 85 TURBINE PLANT PERFORMANCE Gross Plant Efficiency Gross Plant Heat Rate Unit Operating Factor Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor BTU/KWH 34.3 9941.0 99.8 100.0 100.0 103.4 34.1 10015.9 99.7 100.0 100.0 102.5 33.2 10274.7 76.6 79.8 79.8 77.4
RGBE GINNASTATION OPERATING
SUMMARY
November, 1998 Page 2 of 2 OPERATIONS RECORDS Category 3.4.8 Reviewed by NUCLEAR NUCLEAR PLANTOPERATION (HOURS)
NUCLEAR PLANTSHUTDOWN (HOURS)
REACTOR RESERVE SHUTDOWN {HOURS)
NUCLEAR PLANTTOTAL (HOURS)
NUMBER OF CRITICALITIES NUMBER OF SHUTDOWNS a) Normal b)Trips c)Total GROSS THERMAL EQUIVALENTFULLPOWER (HOURS)
Cumulative Total Commencing January 1, 1975 REACTOR PLANT PERFORMANCE Reactor Service Factor Reactor AvailabilityFactor UNITFORCED OUTAGES Unit Forced Outage (Hours)
Unit Forced Outage Rate MWHR MONTH 720.0 0.0 0.0 720.0 0.0 0.0 0.0 0.0 1092182.0 718.5 100.0 100.0 0.0 0.0 YEAR 8016.0 0.0 0.0 8016.0 0.0 0.0 0.0 0.0 12146842.0 7991.4 100.0 100.0 0.0 0.0 TO DATE 205975.2 47067.7 1687.6 254730.5 386.0 280.0 105.0 385.0 290028235.0 192746.9 80.9 81.5 11446.7 5.3 NOTE: This form has been revised to be consistent with U.S. Nuclear Regulatory Guide 1.6, Appendix A, Rev. 4, Aug. 1975 Titled "Reporting of Operating Information"- Technical Specifications
s 4
C November 1998 100 90 80 70 60..
L 50 0
<0-30 20--
10 0-N 8
tt 0
CO 4
CO 0
0 v
8 C9 0
0 0
0 0
0 0
0 0 i w r 0)
CO N
CO Ol O
v N
A rt lA CO h
00 CV CV CV
= 8 8
CV C4 CV Date