CATEGORY j.

REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR".9607170017 DOC.DATE: 96/06/30 NOTARIZED: NO 'DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear. Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.D. Rochester Gas 6 Electric Corp.

WIDAY,;G.A. Rochester Gas 6 Electric Corp.

RECI(,.NAME RECIPIENT AFFILIATION VZSSINh,G.S. Document Control Branch (Document Control Desk)

SUBJECT:

Monthly operating rept for June 1996 for Ginna Station.

W / 960711 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly, Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 h

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 G.. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 T R 0 1 1 NRR/DRPM/PECB 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1

~

D 0

E N

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

'TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TELEPHONE AREA CODC 7>a 546-2700 July 11, 1996 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for June, 1996 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of June, 1996.

Very truly yours,

+Joseph A. Widay Plant Manager xc: U. S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C. 20555

/

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission Mr. W.H. Lovelace MNBB 7602 Washington, D.C. 20555 U.S. NRC Ginna Senior Resident Inspector Attachments 9607170017 960630 PORE"" ADOGK 05000244 i R, l~, gp(~

t PDR L,

r~c 50-244 Jul 11 1996 COMPLETED BY:

John V. Walden TELEPHO E (716) 771-3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: June 1996
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to Date Cumulative-

11. Hours in Reported Period 720.0 4367.0 233135.0
12. Number of hours Reactor Was Critical 503.3 2612.6 186279.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On. line 462.6 2568.6 '83317.3
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 631374.0 3704308.0 '60567616.0
17. Gross Electrical Energy Generated (MWH) 214132.0 1259724.0 86322224.0
18. Net Electrical Energy Generated (MWH) 203264.0 1197305.0 81945117.0
19. Unit Service Factor (%) 64.2 58.8 78.6
20. Unit Availability Factor (%) 64.2 58.8 78.6
21. Unit Capacity Factor (using MDC Net) (%) 60.1 58.3 75.8
22. Unit Capacity Factor (using DER Net) (%) 60.1 58.3 75.8
23. Unit Forced Outage Rate (%) 0.0 3.2 5.5
24. Shutdovms Scheduled Over Next 6 Months(Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Fores st ,Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

'* CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

e Cy

'll $

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Jul 11 1996 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH June 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 487
2. 18. 491
3. 19. 494
20. 465
21. 472
6. 22.

7 ~ -13 23. 494

8. -14 24. 494
9. -15 25. 493
10. 47 26. 490 160 27. 488
12. 28. 489
13. 112 29. 491
14. 356 30. 487
15. 455 31.
16. 488 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

lA 4 I

, <gvqg

DO( KET NO SO-244 f UNITNAhlE R E. GINNA NUCLEAR oWER,PLANT DATI:.

UNIT SHUTDOWN AND POWER REDUCTIONS COhtPLI'.l'I'.D BY ~ I> ~

V. Walden

'hn q I:.LI:.PIIO: 716 771-3588 L

Ol c u

~0 Licensee C

O Ill Cause L Corrective 0 C o 0 Ew C 0 Event o Action to No. Date Q o

Q o

Q 0 l/l C Report h EA 0 Prevent Recurrence O

0 Cl 4/1/96 S 226.0 C Scheduled shut down for refueling and maintenance.

6/10/96 Blowdown system was operated improperly which allowed air to

.enter the condenser. High turbine back pressure resulted in a turbine trip with the reactor remaining critical.

6/12/96 S 29.6 B Scheduled shut down for turbine testing and repairs, of secondary system leaks.

6/20/96 F 12.7 A Power reduction for repairs of off-site circuit 908. Turbine remained on-line.

1 Reason: hlethod: Exhibit G - Instructions F: Forced for Prcparatton of Data S: Scheduled A-Etluipmcnt Failure (Explain) I-hfanual B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) Exhibit I - Same Source REV. 4/85 494t9

E '

p(,

NARRATIVE SUM5GWY OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Jul 11 1996 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH June 1996 The unit was started up and brought on-line on June 10, 1996. A turbine trip occurred on June 10, 1996 due to high turbine back pressure. The unit was placed back on-line on June 10, 1996. A schedule unit shutdown for turbine testing and secondary system maintenance took place on June 12, 1996. The unit was placed one-line on June 13, 1996. Power ascension was limited by fuel conditioning.

Full power was reached on June 15, 1996. A power reduction occurred on June 20, 1996 due to a failure on the electrical distribution system offsite. The unit was reduced to 72'. power while repairs were made. The unit remained at full power for the remainder of the month.