Monthly Operating Rept for Nov 1995 for Re Ginna Nuclear Power Plant.W/951207
ML17264A287
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9512140172
Download: ML17264A287 (7)


Text

FR.IC3R.I ACCELERATED EY RIDS PROCESSING REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET g FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp. P, WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFXLIATION R'

SUBJECT:

Monthly opera Power Plant 51207 t for Nov 1995 for RE Ginna Nuclear DISTRIBUTION CODE: IE24D COPIES RECEXVED:LTR -

ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 R COPIES RECIPIENT

,'E COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 J ON,A 1 1 T INTERNAL: AEOD/SPD/RRAB 1 1 - E CEN- 1 1 NRR/DRPM/PECB 1 1 RGN1 1 1 Y,'

EXTERNAL: LITCO BRYCE,J H 1' NOAC 1 . 1 NRC PDR 1 1 C

N YO'I'E TO ALL"RIDS" RECIPIEY'TS:

PLEASE HELP US TO RF DUCE 'O'KSTE! COYTACT'I'IIE DOCL'WIEYT COYTROL DESK. ROOK! Pl-37 (EXT. 504-~083 ) TO I LINIIYATEYOUR YAi!LFROil DISTRIBUTION LISTS I'OR DOCI.'h !EX'I'S YOL'O.'4"I'l,"I D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

zzmgz 'tzzz ~ I ~ Ow I ha u II'ZZZZZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14849-appal TCLEPHONE ARL'A coDE Tlat 546.2700 GINNA STATION December 7, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for November, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1995.

Very truly yours, Joseph A. Widay Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

L400gy 9512140172 951130 PDR ADOCK 05000244

. R , PDR

OPERATING DATA REPl%T 50-244 December 7 1995 COMPLETED BY John V. Walden TELEPHONE (716) 7714588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: November 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur In Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An .

This Month Yr.-to-Date Cumulative

11. Hours in Reported Period 720.0 8016.0 228024.0
12. Number of hours Reactor Was Critical 720.0 7107.3 182923.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 720.0 7032.4 '80004.7
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 1057617.0 10252215.0 '55767452.0
17. Gross Electrical Energy Generated (MWH) 360429.0 3455281.0 84689333.0
18. Net Electrical Energy Generated (MWH) 342871.0 3283693.0 80392923.0
19. Unit Service Factor (%) 100.0 87.7 78.9
20. Unit Availability Factor (%) 100.0 87.7 78.9
21. Unit Capacity Factor (using MDC Net) (%) 101.3 87.2 76.1
22. Unit Capacity Factor (using DER Net) (%) 101.3 87.2 76.1
23. Unit Forced Outage Rate (%) 0.0 0.6 5.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Start 4/01/96 Duration 60 da

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY VNIT POWER LEVEL IV DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE. ecember 7 1995 COMPLETED BY:

John Walden TELEPHONE: 7 771-3588 MONTH November 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 476
2. 18. 476
3. 475 19. 475 475 20. 474
5. 475 21. 474
6. 22. 476
23. 476
24. 476
9. 476 25. 477
10. 476 26. 477 476 27. 477
12. 476 28. 476
13. 476 29. 476
14. 476 30. 476
15. 476 31.
16. 476 INSTRVCTIONS On this format, list the average daily unit, power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCK I:T NO.

UNIT NAhll'. R E. CilNNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(.OhIPLl.,l I.D BY ohn V. Maiden Pl c4 0 C 0 e C v Licensee Ew Cl Ml 0 Cause g Corrective E e 0 0 Event 0 0 Action to No. Date 0 0 0 0

~ 0 0 E Prevent Recurrence 0 0 N 0 Report 5 EA IZ lJ 0

CI Reason: hlcthod: Exhibit G - Instructions F: Forced for Preparation of Data S: Scheduled '-Equipmcnt Failure (Explain) I-hlanua I I3-Maintenance or Test 2-hlanual Scram. Entry Sheets for Licensee 3-Automatic Scram. Event Rcport (LER) File (NUREG-C-Refueling D-Regulatory Restriction 4-Other (Explain) OI6I)

E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) Exhibit I - Same Source REV. 4/85 4949

IGQGGKTIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: D ember 7 1995 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH November 1995 Average power for the month was 97%