ML17265A167

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1998 for Re Ginna Nuclear Power Plant
ML17265A167
Person / Time
Site: Ginna 
Issue date: 01/31/1998
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9802200102
Download: ML17265A167 (8)


Text

CATEGORY 1~

REGULATORY INFORMATION DISTRIBUTIONSYSTEM (RIDS) o(

ACCESSION NBR:9802200102 DOC.DATE: 98/01/31 NOTARIZED: NO FACXL:50-244 Robert.

Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME i

AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas

& Electric Corp.

WIDAY,J.A.

Rochester Gas 6 Electric Co;p.

RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000244 VISSING, G. S.

SUBJECT:

Monthly operating rept for Jan 1998 for RE Ginna Nuclear Power Plant.W/980211 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 Q

RECIPIENT ID CODE/NAME PD1-1 PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1

1 VISSXNG,G.

COPIES LTTR ENCL 1

1 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1

1 1

1 1

1 1

LE CENTER RGN NOAC 1

1 1

1 1

1 D

0 U

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

dP c

"I kj 1

i)lj,,Pi7(7I/,)'. "',"...'~iI Ilh"'!liki~il '""iJi!!ilrfIII ROCHESTER 'GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE, ROCHESTER, N.K 14649-0001

'iCAA ICAIC TELERaONE AREA coDE Tle 546.2700 February 11, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for January, 1998

, Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of January, 1998.

Very truly yours, Joseph A. Widay Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 9802200i02 'T)80i3i PDR ADQCK 05000244 R

PDR

)(

IIIIIIIIIIIIIIIIIIIII IIII.lllllllllli'

l

~

v

~

CP-OPER)SING DATAREPORT COMPLETED BY:

50-244 Februa 11, 1998 John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

Janua

, 1998 3.

Design Electric Rating (Net MWe):

470 4.

Maximum Dependable Capacity (Net MWe):

Notes:

This Month Yr.-to-Date Cumulative**

5. Number of hours Reactor Was Critical
6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electrical Energy Generated (MWH) 744.0 744.0 0.0 368962.0 744.0 744.0 0.0 368962.0 198703.2 195682.7 85 87910478.4
    • CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969

4

~

p

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER'PLANT DATE: Februar 10 1998 COMPLETED BY:

John V. Walden T

UNIT SHUTDOWN REPORTING PERIOD:

Januar 1998 (Month/Year)

NO.

DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)

REASON"'ETHOD OF SHUTTING DOWN"'AUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit operated at full powerfor the entire month of January.

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

0

, ~

-4;c I/